Laserfiche WebLink
VOICE & DATA COMMUNICATIONS <br />Section 16760 <br />15-1207 <br />k. For new construction defer to IT specifications. <br />2. Upon completion of IT related services performed by contractor shall be reviewed by IT <br />personnel. <br />3. IT personnel shall be accompanied by contractor to review work performed and to ensure work <br />has been completed according to scope or specification. <br />4. If work has not been completed to the satisfaction of the scope or specification, the contractor <br />shall develop a punch list detailing those items that did not meet the requirements of Manteca <br />Unified School District IT Department. The punch list shall be in an electronic format and <br />shared with the IT Department. <br />5. Contractor shall complete all punch list items identified during IT and contractor's walk <br />through. The contractor shall update the electronic version of the completed items and share <br />with the IT department. <br />6. IT personnel shall be accompanied by contractor to review that the outstanding punch list <br />items have been documented as complete. <br />7. IT will not sign -off on any IT related services until all punch list items are complete. The <br />contractor will be responsible for ensuring the punch list items are complete to the scope's <br />satisfaction. <br />3. IT related services are but not limited to: <br />a. Demolition of Wireless Radio Frequency WAN Towers <br />b. Fiber Cabling Infrastructure <br />c. Copper Cabling Infrastructure <br />d. Cisco Network Switches <br />e. Cisco Network Routers <br />f. Cisco Wireless Access Points <br />g. Cisco VolP Phones <br />h. Network Configurations (Access, Distribution, Core, VRF, MPLS, Call Manager) <br />i. Network Wireless Configurations (WLAN Controller, MSE) <br />j. Network Security Configurations (Cisco Firewalls, ISE) <br />k. Network Management Configurations (Prime Infrastructure) <br />1 A____._ Security <br />/�_.__e_e <br />i. Hrecont Security Carneras <br />m. Exacqvision Enterprise <br />n. Dell Servers <br />o. DMAC Cabinet/Enclosures <br />p. APC Uninterruptable Power Supply <br />5.3 OUTSTANDING PUNCH LIST ITEMS <br />.. - <br />1. The purpose of this section is to detail the process and procedures for contractors to obtain <br />sign -off on any Information Technology related services performed or provided. <br />2. A detailed scope of work should be reviewed by contractor to ensure services can be <br />delivered. <br />3. If contractor find any part of the scope of work to be questionable or unclear, it is the <br />• �•a sa � 'the <br />t i• i 1 <br />responsibility of <br />� ut. tie contractor to ask t .e appropriate questions to ensure scope oft work is <br />clear. <br />S. Procedure <br />1a <br />.v <br />