My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VOICE & DATA COMMUNICATIONS <br />Section 16760 <br />15-1207 <br />5.2 MOVES, ADDS, AND CHANGES <br />A. Purpose: <br />1. The purpose of this section is to provide the scope of work detailing Moves, Adds, and <br />Changes (MACs) related to the new construction, modernization, and relocating of buildings. <br />2. This specification is to outline if such changes do occur that MACs do not impact other building <br />infrastructure and network services. <br />3. This specification shall outline the precautions needed to ensure that buildings impacted by <br />such changes are taken into account during planning, and to ensure that network infrastructure <br />and services are included during implementation. <br />B. Procedure: <br />1. During planning of new construction, modernization, and relocating of building, facilities, <br />contractors, and other departments shall include the Information Technology department to <br />ensure that the scope of such changes will not impact IT related services. <br />2. If changes will impact IT related services, IT will inform the responsible parties of the impact <br />and defer responsible parties to the IT specifications. <br />3. Responsible parties performing the scope of such changes, should ensure that the network <br />infrastructure is accountant for in planning and budget <br />C. Scope: <br />Moves, Adds, and Changes <br />a. Prior to building removal and tear downs, a thorough investigation will be required to <br />ensure that any IT related services are not impacting other buildings. <br />b. If IT related services are impacted, measures will need to be put in place prior to building <br />removal and tear downs to ensure no IT related services are lost during such changes. <br />c. If adding network endpoints such as, but not limited to, cameras, clock/speaker, horns, <br />wireless access points, and additional network drops. Network Switch port capacity <br />should be surveyed to ensure port availability. <br />d. If additional network equipment is needed, cabinet size may need to be increase to <br />accommodate additional network equipment and wire management. <br />e. If such changes require Network Cabinets MDF and IDFs to be added defer to IT <br />specifications. <br />f. If such changes due to modernizations, building removals, and tear downs, the <br />responsible parties (Facilities and/or Contractor) shall be responsible for removal of <br />network equipment such as, but not limited to, routers, switches, UPS, VoIP phones, <br />security cameras, wireless access points, clocks/speakers, horns, and network cabinets. <br />g. Facilities and/or Contractor shall be responsible for storing equipment in a secured <br />location. <br />h. Contractors shall be responsible for repurposing the equipment for re -use once new <br />building or locations of equipment is needed to restore IT related services. <br />i. Contractor shall defer to IT specifications to ensure re -deployment of network equipment <br />is consistent with IT standards. <br />j. Contractor shall be responsible for reconfiguring network equipment to current IT <br />standard configurations. These standard configurations can be obtained by contacting <br />the Network Supervisor in the IT department. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.