Laserfiche WebLink
LABLING SCHEME, NAMING <br />CONVENTION & RACK ELEVATION <br />Section 16761 <br />15-1207 <br />E. IT personnel shall be accompanied by contractor to review that the outstanding punch list <br />items have been documented as complete. <br />F. IT will not sign -off on any IT related services until all punch list items are complete. The <br />contractor will be responsible for ensuring the punch list items are complete to the scope's <br />satisfaction. <br />G. IT related services are but not limited to: <br />1. <br />Demolition of Wireless Radio Frequency WAN Towers <br />2. <br />Fiber Cabling Infrastructure <br />3. <br />Copper Cabling Infrastructure <br />4. <br />Cisco Network Switches <br />5. <br />Cisco Network Routers <br />6. <br />Cisco Wireless Access Points <br />7. <br />Cisco VoIP Phones <br />8. <br />Network Configurations (Access, Distribution, Core, VRF, MPLS, Call Manager) <br />9. <br />Network Wireless Configurations (WLAN Controller, MSE) <br />10. <br />Network Security Configurations (Cisco Firewalls, ISE) <br />11. <br />Network Management Configurations (Prime Infrastructure) <br />12. <br />Arecont Security Cameras <br />13. <br />Exacqvision Enterprise <br />14. <br />Dell Servers <br />15. <br />DMAC Cabinet/Enclosures <br />16. <br />APC Uninterruptable Power Supply <br />Diagram 1. Frame Identification <br />IDF10 <br />x <br />i 53 <br />52 <br />54 <br />¢7 33 35 tt !3 FS 37 �a s <br />IDF9� IQF3 <br />�F? IDFd 3a 35 <br />ac i i <br />2DI zs <br />v v <br />av v 22 Z3 1QF <br />v <br />g ?A 25 <br />4 <br />€ e [r=K)F6 <br />�K.�.A <br />44FIDRS <br />DF7 Ae + CY amu <br />K IL <br />c)Cace <br />fad <br />i !f <br />3 <br />