My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF WORK <br />Section 01010 <br />15-1207 <br />and after the primary construction period. Coordinate the construction schedule and <br />operations with the Owner's representative. <br />The three stages of the construction process following the bid award shall be: <br />Pre -construction: Pre -construction activities shall occur from the start date, to the first <br />day of availability. Activities shall include, but are not limited to: <br />Identification of long lead materials and equipment <br />Shop drawing submittals <br />Deferred approval submittals <br />Field measuring <br />Color and sample submittals <br />Material ordering (particularly long lead items) <br />Material stock piling <br />Project scheduling/subcontractor coordination <br />The architect and engineers will expedite all long lead item submittals as quickly as <br />possible. Such items must be indicated as "critical" when submitted. Substitutions of <br />finishes, materials and equipment will not be permitted due to the lack of availability <br />unless submittals are made early and completely. <br />2. Construction: Primary construction activities shall occur from the date of availability, <br />through the Date of Substantial Completion. Activities shall include work as <br />described by the construction documents. <br />It is the intention of the district to make these buildings available on the dates <br />indicated below. Some work may occur before abatement begins if coordinated with <br />the abatement contractor. Certain units also may be available earlier than the dates <br />shown. The general contractor must coordinate with the abatement contractor when <br />access will be available. <br />Due to the nature of the work and the type of facilities, the schedule is fixed and <br />cannot be altered. The premises will not be available prior to date of availability. All <br />primary work must be completed prior to Date of Substantial Completion. Critical <br />work, includes life safety, HVAC, plumbing, electrical service, security and general <br />construction. Temporary measures will be required if primary work is uncompleted at <br />start of school date. <br />General Contractor shall submit a phasing plan pf work, staging temporary facilities, <br />and fencing for District approval. <br />3. Completion/Close-out: Completion and close-out activities shall occur from Date of <br />Substantial Completion to Final Completion. Activities shall include: <br />a. Completion of minor finish work. Minor work shall be considered completion <br />or installation of items which will not interfere or hinder the district from utilizing <br />the facility, such as touch-up painting, hardware adjustment, etc. <br />b. Punch list work. <br />C. Project close-out. <br />All work performed during this period must occur outside of normal school hours. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.