My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF WORK <br />Section 01010 <br />15-1207 <br />within the area of work. Prior to start of trenching operations, the Contractor shall meet with <br />District Representative(s) to fully review known utility locations which may affect the work. <br />E. In accordance with Section 4215 of the Government Code of the State of California, the <br />District shall make provisions to compensate the Contractor for the costs of locating, repairing <br />damage not due to the failure of the Contractor to exercise reasonable care, and removing or <br />relocating such main and trunk line utility facilities not indicated in the plans and specifications <br />with reasonable accuracy, and for equipment on the project necessarily idled during such <br />work. Compensation will be in accordance with the provisions of these specifications <br />providing for change orders. Nor shall the contractor be assessed liquidated damages for <br />delay in completion of the project, when such delay was caused by the failure of the District or <br />the owner of the utility to provide for removal or relocation of such utility facilities. <br />F. Nothing herein shall be deemed to require compensation to the Contractor or to relieve him <br />from being assessed liquidated damages for such delay when the presence of unidentifiable <br />utilities can be inferred from the presence of other visible facilities, such as buildings, meter <br />and junction boxes, on or adjacent to the site of construction, and the damage to existing <br />utilities or delay was caused in whole or in part by a failure of the District to indicate the <br />presence of such service laterals or appurtenances. <br />G. In the event the Contractor discovers utilities not identified in the Contract plans or <br />specifications, the Contractor shall immediately notify the Architect and the utility owner by the <br />most expeditious means available and later confirm in writing. <br />H. Existing building utilities shall not be interrupted during normal operating hours. <br />END OF SECTION <br />1:11207 Lincoln es -cafeteria replacementl4.06 projman101010 summary of work.doc <br />Last Updated: April 20, 2010 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.