Laserfiche WebLink
SECTION 01151A <br />CONTRACTOR'S CONSTRUCTION WASTE AND RECYCLING PLAN <br />Continued <br />SECTION II - DISPOSED MATERIALS <br />Include all disposal activities for landfills, transfer stations, or inert landfills where no recycling will occur. <br />Type of Type Facility to be Total Truck Total Quantities <br />Material of Activit Used/Location Loads Tons Cubic YD Other Wt. <br />(ex.) D 08 DEF Landfill, Los Angeles 2 35 <br />b. Total Disposal 0 0 0 <br />g <br />SECTION III - TOTAL MATERIALS GENERATED <br />This section calculates the total materials to be generated during the project period (Reuse/Recycle + Disposal = Generation <br />Tons Cubic YD Other Wt. <br />a. Total Reused/Recycled 0 0 0 <br />b. Total Disposed 0 0 0 <br />c. Total Generated 0 0 0 <br />gana�s a <br />M11 <br />SECTION IV - CONTRACTOR'S LANDFILL DIVERSION RATE CALCULATION <br />Add totals from Section I + Section Il <br />Tons Cubic Yards Other Wt. <br />a. Materials Re -Used and Recycled 0 <br />b. Materials Disposed 0 <br />c. Total Materials Generated (a. + b. = c.) 0 0 0 <br />d. Landfill Diversion Rate (Tons Only)* #DIV/0! <br />* Use tons on/v to calculate recvcling percentages: Tons Reused/Recycled/Tons Generated = % Recycled <br />.�5... <br />Contractor's Comments (Provide any additional information pertinent to planned reuse, recycling, or disposal <br />activities): <br />01WIM.k t a4.-o-\�,�2`�,. '� '`, <br />'r k4•k� i z t \fid a fit,, <br />Notes: <br />1. Section 01151A is a Division 01 General Requirement under CSI MasterFormat 1998 Edition. <br />For CSI MasterFormat 2004 Edition, this Section may be renumbered as follows: <br />Under Division 00, Procurement and Contracting Requirements, Project Forms 00 60 00 <br />Use: Section 00 62 22 Construction Waste Diversion Plan <br />2. Suggested Conversion Factors: From Cubic Yards to Tons (Use when scales are not available) <br />Asphalt: .61 (ex. 1000 CY Asphalt = 610 tons. Applies to broken chunks of asphalt) <br />Concrete: .93 (ex. 1000 CY Concrete = 930 tons. Applies to broken chunks of concrete) <br />Ferrous Metals: .22 (ex. 1000 CY Ferrous Metal = 220 tons) Drywall Scrap: .20 <br />Non -Ferrous Metals: .10 (ex. 1000 CY Non -Ferrous Metals = 100 tons) Wood Scrap: .16 <br />[PROJECT TITLE] Contractor's Construction Waste and Recycling Plan <br />[DATE] Section 01151 A-2 <br />