|
SECTION 01151 B
<br />CONTRACTOR'S REUSE, RECYCLING, AND DISPOSAL REPORT
<br />(Submit With Each Progress Payment)
<br />k,,. Yn��R,���. �\�ti�4,t�� ���� �,l� �. �+. k�. �`�'' s, ��'+r�\ ��^. �. ,v.� +.\.� `�. �;..� �'�,�k +,���.:� �{k � � ,�.'s°+� ?:,. •atm ��..."
<br />�kkk k�\ \ � , o�4�'a�k�'*k\4k� k o,k� �� �`��,'.,t;{'•h�`C; i'k� �- \ 4'���',`�\* �� 3� ,'�';'S.�\`�k'., � �.. . �k� 4��3• 5?s �L�,�� ..�'���,�+',,'t �
<br />Project Title:
<br />Contract or Work Order No.:
<br />Contractor's Name:
<br />Street Address:
<br />City: I State: Zi :
<br />Phone: ( Fax:
<br />E -Mail Address:
<br />Preeared by: Print Name
<br />rk �' `, •`.•'{ki vie ,ki,':2 tip`,; ¢ate tiu? S a '+.-.s.`-'�+. '�..-`�' k -4`-{\£\ iti .+, IN k� 's { -S ��% � - ,u� y?:k����a s.2..{'S :;_..�- _ � �..s.�,`,.. > �.vv..�•.i,`v ._.�., ��._�vk i,.'ss\?}�: .. �t�i���' a a,..
<br />Date Submitted:
<br />Period Covered: From: To:
<br />'`111
<br />,'k.k'�•$, .. i '`ate.. sx +, kx t• - <^�' \ �2"'?�'-
<br />... ti.:. ���c.. �:� �.�. ;.,a: 4?f�a'>s�,. e ;�"�;,bti.�'k����.. �' ....�• �, .� .,�kh ... �,�'����'r �'�'�:.
<br />Reuse, Recycling or Disposal Processes Used
<br />Describe the types of recycling processes or disposal activities used for material generated in the project. Indicate the type
<br />of process or activity by number, types of materials, and quantities that were recycled or disposed in the sections below:
<br />01 - Reuse of building materials or salvage items on site (i.e. crushed base or red clay brick)
<br />02 - Salvaging building materials or salvage items at an off site salvage or re -use center (i.e. lighting, fixtures)
<br />03 - Recycling source separated materials on site (i.e. crushing asphalt/concrete for reuse or grinding for mulch)
<br />04 - Recycling source separated materials at an off site recycling center (i.e. scrap metal or green matls)
<br />05 - Recycling commingled loads of C&D matls at an off site mixed debris recycling center or transfer station
<br />06 - Recycling material as Alternative Daily Cover at landfills
<br />07 - Delivery of soils or mixed inerts to an inert landfill for disposal (inert fill).
<br />08 - Disposal at a landfill or transfer station.
<br />09 - Other (please describe)
<br />IBM
<br />Types of Material Generated
<br />Use these codes to indicate the types of material that were generated on the project
<br />A = Asphalt C = Concrete M = Metals I = Mixed Inert G = Green Matis
<br />D = Drywall P/C= Paper/Card board W/C = Wire/Cable S= Soils (Non Hazardous)
<br />M/C = Miscellaneous Construction Debris R = Reuse/Salvage W = Wood O = Other (describe)
<br />Facilities Used: Provide Name of Facility and Location (City)
<br />Total Truck Loads: Provide Number of Trucks Hauled from Site During Reporting Period
<br />Total Quantities: If scales are available at sites, report in tons. If not, quantify by cubic yards. For salvage/reuse items,
<br />ouantifv bv estimated weight or units).
<br />SECTION I - RE-USED/RECYCLED MATERIALS
<br />Include all recycling activities for source separated or mixed material recycling centers where recycling occurred.
<br />Type of Type Facilities Total Truck Total Quantities
<br />Material of Activit Used/Location Loads Tons Cubic YD Other Wt.
<br />(ex.) M 04 ABC Metals, Los Angeles 24 355
<br />a. Total Diversion 1 01 0 0 0
<br />[PROJECT TITLE] Contractor's Reuse, Recycling, and Disposal Report
<br />[DATE] Section 01151 B-1
<br />
|