SUBMITTALS <br />Section 01300 <br />15-1207 <br />Schedule of Values. This Schedule, when approved by Architect, shall be used as basis for <br />Contractor's applications for payment. Payment shall not be released until a Schedule of <br />Values is accepted. <br />B. Schedule of Values shall appear similar to the following list. It shall be detailed at least as <br />shown and portions shall not be more largely grouped so as to reduce its length unless <br />appropriate to the scope of the Work. Mobilization/Start-up is limited to 2% on contracts <br />greater than $1,000,000 and 4% on contracts less than $1,000,000. Contract closeout to be <br />a minimum of 1 %. <br />Mobilization/Start-up <br />Temporary Facilities <br />Grading <br />Paving <br />Building Concrete <br />Self -Leveling Concrete Floor Underlayment <br />Site Concrete <br />Concrete Reinforcement <br />Concrete Masonry Units <br />Lumber <br />Trusses <br />Millwork/Trim <br />Structural Steel/Metals <br />Rough Hardware <br />Hollow Metal Doors <br />Wood Doors <br />Roof Hatches <br />Built Up Roofing <br />Metal Roofing <br />Architectural Metal Soffits <br />Water Proofing <br />Insulation <br />Glass and Glazing <br />Caulking and Sealants <br />Ceramic Tile <br />Lath and Plaster <br />Drywall <br />Acoustical Ceiling <br />Paint/Wall Coverings <br />Finish Flooring <br />Finish Hardware <br />Toilet Accessories <br />Metal Lockers <br />Window Coverings <br />Flagpole <br />Fire Extinguishers <br />Signage <br />Athletic Equipment <br />Toilet Partitions <br />Kitchen Equipment <br />Plumbing - Site <br />Plumbing - Building <br />HVAC/Sheet Metal <br />Electrical - Site <br />Electrical - Building <br />2 <br />