My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROGRESS SCHEDULES <br />Section 01310 <br />15-1207 <br />actions (and any others he may deem necessary) at no additional cost to the Owner: <br />1. Increase construction manpower in such quantities and crafts as will substantially <br />eliminate the lag in schedule progress. <br />2. Increase the number of shifts per work day, work days per week, or amount of <br />construction equipment, or any combination of the foregoing, sufficient to substantially <br />eliminate the lag in scheduled progress. <br />3. Re -schedule activities to achieve maximum practical concurrency of accomplishment. <br />4. Those actions determined necessary to re-establish the original scheduled progress <br />shall be incorporated into the next schedule update. Should the results of the planned <br />corrective actions prove insufficient, additional corrective actions shall be taken. <br />5. The submission of an amended schedule will not relieve the Contractor of the <br />responsibility to notify the Architect in writing of all experienced or anticipated delays in <br />the prosecution of the work. <br />PART 2 - MATERIALS <br />Not Used <br />PART 3 - EXECUTION <br />Not Used <br />END OF SECTION <br />i.11207lincoln es - cafeteria replacementl4.06 projman101310—progress schedules.doc <br />Last Updated. 09/06/05 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.