My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTING LABORATORY SERVICES <br />Section 01400 <br />15-1207 <br />B. Include: <br />1. Date of issue, <br />2. DSA Application and File numbers, <br />3. Project title and number, <br />4. Name of inspector, <br />5. Date and time of sampling or inspection, <br />6. Identification of product and Specification Section, <br />7. Location in the Project, <br />8. Type of inspection or test, <br />9. Date of test, <br />10. Results of test, <br />11. Conformance with Contract Documents. <br />C. When requested by Architect, provide interpretation of test results. <br />1.06 LIMITS ON TESTING LABORATORY AUTHORITY <br />A. Laboratory may not release, revoke, alter or enlarge on requirements of Contract Documents. <br />B. Laboratory may not approve or accept any portion of the work. <br />C. Laboratory may not assume any duties of Contractor. <br />D. Laboratory has no authority to stop the work. <br />1.07 CONTRACTOR RESPONSIBILITIES <br />A. Deliver to laboratory at designated location, adequate samples of materials proposed to be <br />used which require testing, along with proposed mix designs. Allow reasonable time for <br />review and testing. <br />B. Arrange for, and coordinate with, laboratory for all required testing and inspection. Provide <br />adequate notice, in advance, for proper scheduling and processing of testing. The Inspector <br />will not be responsible for scheduling or arranging for testing and inspection services. <br />C. Cooperate with laboratory personnel, and provide access to the work and to manufacturer's <br />facilities. <br />D. Provide incidental labor and facilities to provide access to work to be tested, to obtain and <br />handle samples at the site or at the source of products to be tested, to facilitate tests and <br />inspections, storage and curing of test samples. <br />E. Notify Architect, Inspector, Structural Engineer (when applicable) and laboratory 24 hours <br />prior to expected time for operations requiring inspection and testing services. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.