My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION FACILITIES AND <br />TEMPORARY CONTROLS <br />Section 01500 <br />15-1207 <br />PART 1 - GENERAL <br />1.01 INCLUSION OF OTHER CONTRACT DOCUMENTS <br />A. The General Conditions, Supplementary Conditions and Division 1 are fully applicable to this <br />Section, as if repeated herein. <br />1.02 WORK INCLUDED <br />A. Furnish and install temporary facilities and controls as hereunder specified, plus other <br />unspecified temporary facilities, including labor, materials, services, utilities and equipment, <br />as may be required for proper performance of the Contract, except as otherwise provided. <br />Temporary facilities and controls required for this work include, but are not necessarily <br />limited to: <br />1. Temporary utilities. <br />2. Field offices. <br />3. Sanitary facilities. <br />4. Construction equipment. <br />5. Enclosures, fencing and barricades. <br />6. Temporary shoring. <br />7. Dewatering measures. <br />8. Temporary signs. <br />9. Site controls and parking. <br />10. Winterization. <br />11. Fire alarm and intrusion alarm. <br />12. Fire safety during construction and demolition <br />13. Existing conditions. <br />14. Meetings. <br />B. Related Work Specified Elsewhere <br />Permanent utilities: Pertinent Specification sections. <br />1.03 REQUIREMENTS OF REGULATORY AGENCIES <br />A. General: Temporary facilities and controls shall be approved by local, state and federal <br />authorities and regulatory agencies having jurisdiction, including insurance companies, with <br />regard to safety precautions, operation and fire hazard. Contractor shall contact local <br />authorities prior to start of work to coordinate local requirements. <br />B. Refer to General Conditions. <br />1.04 PRODUCT HANDLING <br />A. Protection: Use all means necessary to protect and maintain temporary facilities and <br />controls in proper and safe condition throughout progress of work. <br />B. Replacements: In event of loss or damage, immediately make necessary repairs and <br />replacements; as approved by Architect at no additional cost to Owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.