Laserfiche WebLink
EARTHWORK <br />Section 02200 <br />15-1207 <br />and the like shall be removed from site. Excavations resulting from these removal activities <br />shall be cleaned of all loose materials, dish shaped, and widened as necessary to permit <br />access for compaction equipment. Areas exposed by any required over -excavation should <br />be scarified to a depth of 6", moisture -conditioned to near optimum moisture content, and <br />recompacted to at least 95% of the maximum dry density. <br />3.04 TESTING AND OBSERVATION <br />A. All grading and earthwork operations shall be observed by the Geotechnical Engineer or his <br />representative, serving as the representative of the Owner. <br />B. Field compaction tests shall be made by the Geotechnical Engineer or his representative. If <br />moisture content and/or compaction are not satisfactory, Contractor will be required to <br />change equipment or procedure or both, as required to obtain specified moisture or <br />compaction. Notify Geotechnical Engineer at least 48 hours in advance of any filling <br />operation. <br />C. Earthwork shall not be performed without the notification or approval of the Geotechnical <br />Engineer or his representative. The Contractor shall notify the Geotechnical Engineer at <br />least two (2) working days prior to commencement of any aspect of the site earthwork. <br />D. If the Contractor should fail to meet the compaction or design requirements embodied in this <br />document and on the applicable plans, he shall make the necessary readjustments until all <br />work is deemed satisfactory, as determined by the Geotechnical Engineer or <br />Architect/Engineer. <br />E. After each rain event Geotechnical Engineer shall test fill material for optimum moisture. Do <br />not place any fill material until desired moisture is achieved. <br />3.05 CLEARING AND GRUBBING <br />A. Prior to grading, remove all debris off-site. Remove trees and brush including the root <br />systems. Holes resulting from tree and brush removal should be prepared and backfilled in <br />accordance with paragraphs 3.07, 3.08, 3.09, and 3.10. This may require deepening and/or <br />widening the holes to adequately remove disturbed soil and provide room for compaction <br />equipment. Strip the surface of all organics. <br />3.06 CUTTING <br />A. Building pads that are located within a cut/fill transition area will have to be overexcavated to <br />provide a semi -uniform fill beneath the building pad. The portions of building pads located in <br />cut areas shall be overexcavated to provide no more than 1 foot difference in fill placed in <br />the same building pad. <br />B. Do all cutting necessary to bring finish grade to elevations shown on Drawings. <br />C. When excavation through roots is necessary, cut roots by hand. <br />D. Carefully excavate around existing utilities to avoid unnecessary damage. The contractor <br />6t <br />