EARTHWORK <br />Section 02200 <br />15-1207 <br />shall anticipate and perform hand work near existing utilities as shown on the survey, without <br />additional claims or cost. <br />3.07 STRUCTURAL EXCAVATION <br />A. General: Excavate to bear on firm material at contract depth shown on Structural Drawings. <br />B. Footings: All footing excavations shall be of sufficient width for installation of formwork, <br />unless earth will retain its position during concreting. All portions of footings above grade <br />must be formed. In the event that footings are placed against earth, footing widths below <br />grade shall be increased 2 inches from those shown on Drawings and positive protection <br />shall be provided for top corners of trench. <br />C. Unsuitable Ground: Any errors in structural excavation, soft ground, or clay soils found <br />when excavating shall be reported to Architect. In no case shall work be built on any such <br />soft or clayey unsuitable surface. Restore excavations to proper elevation with engineered <br />fill material compacted to 95% of dry density. <br />3.08 SUBGRADE PREPARATION <br />A. Grade compact and finish all subgrades within a tolerance of 0.10' of grades as indicated on <br />Drawings and so as not to pool water. Subgrade within building pads and concrete walks <br />shall be within 0.05' of grades indicated. <br />B. After clearing, grubbing and cutting, subsurface shall be plowed or scarified to a depth of at <br />least 6", until surface is free from ruts, hummocks or other uneven features. Moisture <br />condition to (optimum) (2% above optimum) moisture content and recompact to at least 95% <br />of the maximum dry density as determined by ASTM Test Method D1557. If the existing <br />soils are at a water content higher than specified, the contractor shall provide multiple daily <br />aerations by ripping, blading, and/or discing to dry the soils to a moisture content where the <br />specified degree of compaction can be achieved. After seven consecutive working days of <br />daily aerations, and the moisture content of the soil remains higher than specified, the <br />contractor shall notify the architect. If the existing soils have a moisture content lower than <br />specified, the contractor shall scarify, rip, water and blade existing soil to achieve specified <br />moisture content. The contractor shall make proper allowance in schedule and methods to <br />complete this work. <br />C. After subgrade for fill within building pad area or within paved areas has been cleared, <br />plowed and scarified, it shall be disked or bladed until uniform and free from large clods, <br />brought to (optimum) (2% above optimum) moisture content and compacted to not less than <br />95% of maximum dry density, as determined by ASTM Test Method D1557, and such <br />expressed percentage thereof will be minimum acceptable density for specified work. <br />D. Subgrade in areas to receive landscaping shall be compacted to (90%). <br />E. Where Contractor over -excavates building pads through error, resulting excavation shall be <br />recompacted as engineered fill at Contractor's expense. <br />F. In building pad areas with cut/fill transitions or building pad areas, which are entirely in cut, <br />Me <br />