My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EROSION CONTROL <br />Section 02270 <br />15-1207 <br />[EDIT NOTE: This specification is provided by Civil when a SWPPP is prepared others] <br />PART 1 -GENERAL <br />1.01 SCOPE OF WORK <br />A. General: Provide all materials, equipment and labor necessary to furnish and install erosion <br />and sediment control measures as require by the Storm Water Pollution Prevention Plan. <br />1.02 QUALITY ASSURANCE <br />A. General: Comply with State and local codes and regulations. <br />PART2-PRODUCTS <br />2.01 MATERIALS <br />A. Supply all material as shown and described on the SWPPP. <br />PART 3 - EXECUTION <br />3.01 INSTALLATION <br />A. Install all items necessary as shown on the SWPPP or as required by State and local <br />agencies. <br />3.02 MAINTENANCE AND REMOVAL: <br />A. General: Maintain and repair existing and new erosion control facilities throughout the <br />construction period. Remove silt build up as needed. Repair damage to earth slopes and <br />banks. Erosion control measures shall be left in place. <br />B. Monitoring: Provide monitoring of erosion control measures before and after storm events. <br />Provide a daily log of construction activities and impact on erosion control measures. <br />Update SWPPP continuously throughout construction period. Daily log shall be available <br />on site at all times. <br />C. Cleaning: Keep area clean of debris. <br />D. Removal: Remove all erosion control measures after landscaping is complete. <br />END OF SECTION <br />i.11207 Lincoln as -cafeteria replacement14.06 projman102270 erosion control (swppp provided).doc <br />Received from WCE/ October 17, 2012 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.