Laserfiche WebLink
TRENCHING AND BACKFILLING <br />Section 02210 <br />15-1207 <br />3.07 PROTECTION <br />A. Protect existing surfaces, structures, and utilities from damage. Protect work by others <br />from damage. In the event of damage, immediately repair or replace to satisfaction of <br />Owner. <br />B. Repair existing landscaped areas to as new condition. Replant trees, shrubs or <br />groundcover with existing materials if not damaged or with new materials if required. <br />Replace damaged lawn areas with sod, no seeding will be permitted. <br />C. Replace damaged pavement with new compatible matching materials. Concrete walks <br />to be removed to nearest expansion joint and entire panel replaced. Asphalt to be cute <br />neatly and replaced with new materials. <br />D. Any existing materials removed or damaged due to trenching to be returned to new <br />condition. <br />3.08 SURPLUS MATERIAL <br />A. Remove excess excavated material, unused materials, damaged or unsuitable materials <br />from site. <br />3.09 CLEANING <br />A. Refer to Section 01700. <br />B. Contractor will keep the work areas in a clean and safe condition so his rubbish, waste, <br />and debris do not interfere with the work of others throughout the project and at the <br />completion of work.. <br />C. After completion of work in this section, remove all equipment, materials, and debris. <br />Leave entire area in a neat, clean, acceptable condition. <br />END OF SECTION <br />M1207 Gncoln es - cafeteria replacement14.06 projman1consultantslciviA02210 trenching & backfilling.doc <br />Received from WCEI: October 30, 2012 <br />