My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE DRAINAGE <br />Section 02400 <br />15-1207 <br />3. Pipe shall be bedded uniformly throughout its length. <br />4. Pipe elevation shall be within 0.02 feet of design elevation as shown on plans. <br />5. Off Site Work: All work beyond the property lines shall be done in strict <br />conformance with the requirements of the governing agency. <br />E. Backfilling: <br />1. General: Do not start backfill operations until required testing has been <br />accomplished. <br />2. Trenches and Excavations: Backfill with material as detailed on plans, filling both <br />sides of the pipe at the same time, carefully tamping to hold pipe in place without <br />movement. Refer to Section 02210 — TRENCHING AND BACKFILLING for fill <br />above this layer. <br />F. Grouting of Pipes: Grout pipes smooth and water tight at drop inlet, manholes, and curb <br />inlets. Grout back side of hood at curb inlets all grouting shall be smooth and consistent. <br />G. Off Site Work: All work beyond the property lines shall be done in strict conformance with <br />the requirements of the local agency. <br />E. Cutting and Patching: Remove and replace existing surface features per applicable <br />specification section (i.e. asphaltic concrete or concrete paving) where pipe is installed in <br />areas of existing improvements. <br />3.03 TOLERANCES <br />A. Storm Drain structure grates: <br />B. <br />1. In landscape and lawn areas +- 0.05'. <br />2. In sidewalk and asphalt pavement +-0.025'. <br />3. In curb and gutter application +-0.0125'. <br />C. Cleanout Boxes and Lids: <br />D. <br />1. In landscape areas; 0.10 higher than surrounding finish grade, +-0.05'. <br />2. In sidewalks and asphalt pavement; Flush with surrounding finish grade, +-0.025'. <br />3.03 DEWATERING <br />A. Contractor to provide trench dewatering as necessary, no matter what the source is, at no <br />additional cost to the owner. <br />3.04 FLUSHING <br />A. The Contractor shall thoroughly ball and flush the storm drain system to remove all dirt and <br />debris. Discharge water to an approved location. <br />3.05 CLEANING <br />A. Upon completion of work of this Section promptly remove from the working area all scraps, <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.