Laserfiche WebLink
ORNAMENTAL METAL FENCING - <br />MECHANICALLY FASTENED <br />Section 02446 <br />15-1207 <br />C. ASTM A1011/A1011M - Standard Specification for Steel, Sheet and Strip, Hot -Rolled, <br />Carbon, Structural, High -Strength and High -Strength Low -Alloy with Improved Formability <br />D. ASTM B117 - Practice for Operating Salt Spray (Fog) Apparatus <br />E. ASTM D523 - Test Method for Specular Gloss <br />F. ASTM D822 - Practice For Conducting Tests On Paint and Related Coatings and Materials <br />Using Filtered Open -Flame Carbon -Arc Light and Water Exposure Apparatus <br />G. ASTM D1654 - Test Method for Evaluation of Painted or Coated Specimens Subjected to <br />Corrosive Environments <br />H. ASTM D2244 - Test Method for Calculation of Color Differences from Instrumentally <br />Measured Color Coordinates <br />ASTM D2794 - Test Method for Resistance of Organic Coatings to the Effects of Rapid <br />Deformation (Impact) <br />J. ASTM D3359 - Test Method for Measuring Adhesion by Tape Test <br />1.06 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />B. Submit fully executed, standard manufacturer's Warrantee covering materials, workmanship <br />and finish for a minimum period of twenty (20) years (1 -year for gates). <br />1.07 DELIVERY, STORAGE AND HANDLING <br />A. Deliver products to job in manufacturer's sealed containers and/or original bundles with tags <br />and labels intact. Upon receipt at the job site, all materials shall be checked to ensure that <br />no damage occurred during shipping or handling <br />B. Store materials in weather protected, dry conditions off of ground and in areas so as to not <br />interfere with the progress of the work. <br />C. Transport, store and handle in strict accord with the manufacturer's written <br />recommendations. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />1.08 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report any discrepancies to Architect before proceeding. <br />P) <br />