My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPED UTILITIES <br />Section 02700 <br />15-1207 <br />E. Per 2013 NFPA 13, with California amendments, provide Contractor's material and test <br />certificate to the Owner, Architect, Project Inspector and Local Fire Authority. <br />1.05 SUBMITTALS <br />A. Refer to Section 01300. <br />B. Manufacturer's Data: Submit list and complete descriptive data of all products proposed <br />for use. Include manufacturer's specifications, published warranty or guarantee, <br />installation instructions, and maintenance instructions. <br />C. Provide sieve analysis from accredited testing lab on pipe bedding material. Analysis <br />shall have a current date not older than project contract signing date. <br />D. Sudstitution: Provide all data of proposed material being submitted as a substitution. <br />Provide comparison with specified product data and identify all differences. Failure to <br />provide comparison will be reason for rejection. <br />1.06 FEES, PERMITS, AND UTILITY SERVICES <br />A. Obtain and pay for permits and service charges required for installation of Work. <br />Arrange for required inspections and secure written approvals from authorities having <br />jurisdiction. <br />B. Upon completion of work within right-of-way, provide copies of written final approval to <br />the Architect. <br />1.07 WARRANTY <br />A. Refer to General Conditions and Section 01300. <br />1.08 REFERENCES AND STANDARDS <br />A. ANSI/ASTM D698-00 - Test Methods for Moisture -Density Relations of Soils and Soil - <br />Aggregate Mixtures, Using 5.5 Ib (2.49 Kg) Rammer and 12 inch (304.8 mm) Drop. <br />B. ANSI/ASTM D1556-00 - Test Method for Density of Soil in Place by the Sand -Cone <br />Method. <br />C. ANSI/ASTM D1557-02 - Test Methods for Moisture -Density Relations of Soils and Soil - <br />Aggregate Mixtures Using 10 Ib. (4.54 Kg) Rammer and 18 inch (457 mm) Drop. <br />D. ANSI/ASTM D 3017-05 Test Methods for Moisture Content of Soils and Soil -Aggregate <br />Mixture by Nuclear Methods (Shallow Depth). <br />E. ANSI/ASTM D 422-63 Test Method for Particle Size Analysis of Soil. <br />F. ANSI/ASTM D 4318-05 Test Method for Liquid Limit, Plastic Limit, and Plasticity Limit. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.