My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRRIGATION <br />Section 02810 <br />Project 15-1207 <br />handle and assemble pipe, fittings and equipment. Keep interior of pipes, fittings and <br />accessories clean at all times. Close ends of pipe immediately after installation; leave <br />closure in place until removal is necessary for completion of installation. Do not permit <br />bending of pipe. <br />C. Flushing: Remove end heads and operate system at full pressure until all rust, scale, <br />and sand is removed. Divert water to prevent ponding or damage to finished work. <br />D. Coverage: Accept responsibility for full and complete coverage of irrigated areas to <br />satisfaction of Landscape Architect and make necessary adjustments to better suit field <br />conditions at no additional costs to Owner. <br />3.14 CONCRETE WORK <br />A. Underground anchors and pads for valves boxes are included under this Section of <br />Specifications. Concrete shall have a minimum strength of 2500 psi. The slump test <br />shall be a four inch (4") maximum slump. At twenty-eight days, the concrete shall have <br />a minimum strength of 2500 psi. Use materials and mix in accordance with ASTM C 94. <br />Refer to Section 03300 —CONCRETE WORK. <br />3.15 FIELD QUALITY CONTROL <br />A. Visual Inspection: Verify that all pipe is homogenous throughout and free from visual <br />cracks, holes, or foreign materials. Inspect each length of pipe. All materials are subject <br />to impact test at the discretion of the Landscape Architect. <br />B. Hydrostatic Tests — Open Trench: <br />Center -load piping with a small amount of backfill to prevent arching or slipping <br />under pressure. <br />2. Request the presence of the Proiect Inspector in writing at least forty-eight hours <br />in advance of testing. <br />3. At no additional cost to Owner, test in the presence of the Project Inspector. <br />4. Apply continuous static water pressure of 100 psi when welded plastic joints <br />have cured at least twenty-four hours, and with the risers capped, as follows: test <br />main lines and submains for four hours; test lateral lines for two hours. <br />5. Repair leaks resulting from tests; and repeat tests. <br />6. Test (in presence of District personnel) to determine that all sprinkler heads <br />function according to manufacturer's data and give full coverage according to <br />intent of Drawings. Replace any sprinklers not functioning as specified with ones <br />that do, or otherwise correct system to provide satisfactory performance. <br />C. Continuity Testing: Test locating device and control wires for continuity prior to and after <br />back -filling operations. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.