My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRRIGATION <br />Section 02810 <br />Project 15-1207 <br />3.16 CLEAN-UP <br />A. Remove debris resulting from work of this Section. <br />3.17 ADJUSTMENTS AND MAINTENANCE <br />A. Adjusting System: Prior to acceptance, satisfactorily adjust and regulate entire system. <br />Set watering schedule on controller appropriate to types of plants and season of year. <br />Adjust remote control valves to operate sprinkler heads at optimum performance based <br />on pressure and simultaneous demands through supply lines. <br />B. System Layout: Provide reduced prints of Record Document irrigation plans, laminated <br />in four (4) mil. plastic, of size to fit controller door. Enlarge remote -control valve <br />designations as necessary for legibility. Color -code areas covered by each station. Affix <br />plans to inside of controller door. <br />C. Instructions: Upon completion of work, instruct maintenance personnel on operation and <br />maintenance procedures for entire system. <br />D. Flow Charts: Record and prepare an accurate flow -rate chart for each automatic control <br />valve. <br />3.18 RECORD DRAWINGS <br />A. Regularly update plans of the system and any changes made to the system throughout <br />the project. Record all changes on this plan before trenches are back-filled. <br />B. Record the as -built information on reproducible plans provided by the Architect. <br />Complete and submit 3 copies, laminated, of the Record Drawings to the Architect <br />before applying for payment for work installed. <br />C. Show the following on the Record Drawings accurately to scale and dimensioned from <br />two permanent points of reference: <br />Distance of mainline from nearby hardscape. <br />2. Location of automatic control valves, quick couplers, and gate valves. <br />3. Location and size of all sleeves. <br />4. Location of automatic control wires and spares. <br />3.19 OPERATION MANUALS <br />A. Deliver two complete sets of manufacturer's warranties, Contractor guarantees, <br />instruction sheets, parts lists and operation manuals to the Architect before requesting <br />final acceptance of the project. Do not request final inspection until the sets are <br />approved. <br />END OF SECTION <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.