IRRIGATION <br />Section 02810 <br />Project 15-1207 <br />3.16 CLEAN-UP <br />A. Remove debris resulting from work of this Section. <br />3.17 ADJUSTMENTS AND MAINTENANCE <br />A. Adjusting System: Prior to acceptance, satisfactorily adjust and regulate entire system. <br />Set watering schedule on controller appropriate to types of plants and season of year. <br />Adjust remote control valves to operate sprinkler heads at optimum performance based <br />on pressure and simultaneous demands through supply lines. <br />B. System Layout: Provide reduced prints of Record Document irrigation plans, laminated <br />in four (4) mil. plastic, of size to fit controller door. Enlarge remote -control valve <br />designations as necessary for legibility. Color -code areas covered by each station. Affix <br />plans to inside of controller door. <br />C. Instructions: Upon completion of work, instruct maintenance personnel on operation and <br />maintenance procedures for entire system. <br />D. Flow Charts: Record and prepare an accurate flow -rate chart for each automatic control <br />valve. <br />3.18 RECORD DRAWINGS <br />A. Regularly update plans of the system and any changes made to the system throughout <br />the project. Record all changes on this plan before trenches are back-filled. <br />B. Record the as -built information on reproducible plans provided by the Architect. <br />Complete and submit 3 copies, laminated, of the Record Drawings to the Architect <br />before applying for payment for work installed. <br />C. Show the following on the Record Drawings accurately to scale and dimensioned from <br />two permanent points of reference: <br />Distance of mainline from nearby hardscape. <br />2. Location of automatic control valves, quick couplers, and gate valves. <br />3. Location and size of all sleeves. <br />4. Location of automatic control wires and spares. <br />3.19 OPERATION MANUALS <br />A. Deliver two complete sets of manufacturer's warranties, Contractor guarantees, <br />instruction sheets, parts lists and operation manuals to the Architect before requesting <br />final acceptance of the project. Do not request final inspection until the sets are <br />approved. <br />END OF SECTION <br />14 <br />