My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LANDSCAPING <br />Section 02900 <br />Project 15-1207 <br />3.08 CLEAN-UP <br />A. During construction, keep the site free of rubbish and debris, and clean up the site <br />promptly when notified to do so. Take care to prevent spillage on streets from hauling <br />and immediately clean up any such spillage and/or debris deposited on streets due to <br />the work of this Section. <br />B. During all phases of the construction work, take all precautions to abate dust nuisance <br />by clean-up, sweeping, sprinkling with water, or other means as necessary. <br />3.09 LANDSCAPE MAINTENANCE <br />A. The Landscape Maintenance Period will begin when all the Landscape Maintenance <br />Period Requirements have been met (See Part 1 of these Specifications). <br />B. Cleaning: Maintain cleanliness on paving areas and other public areas used by <br />equipment and immediately remove all spillage. Remove from project site all rubbish <br />and debris found thereon and all material and debris resulting from landscaping work, <br />leaving the site in a safe and clean condition. <br />C. Maintenance: <br />Sprinkler Irrigation System: <br />a. Check system weekly for proper operation. Flush lateral lines out after <br />removing last sprinkler head or two at each end of lateral. Adjust all <br />heads as necessary for unimpeded coverage. <br />b. Set and program automatic controllers for seasonal water requirements. <br />Provide the Owner's Representative with keys to the controllers and <br />instructions on how to turn off system in case of emergency. <br />C. Repair all damages to sprinkler irrigation system as part of the contract <br />work. Make repairs within one watering period or one week, whichever <br />is the least amount of time. <br />2. Turf Areas: <br />a. Begin mowing turf when grass has reached a height of three inches (3") <br />and cut to a height of one-half inches to two inches (1 Y2" - 2"). Mow at <br />least weekly after the first cut. Turf must be well-established and free of <br />bare spots and weeds, to satisfaction of Landscape Architect, prior to <br />final acceptance. Do not mow lawns when the soil is not able to support <br />maintenance equipment. Repair wheel marks and ruts caused by the <br />maintenance equipment at no additional cost to the Owner. <br />b. Pick up grass clippings and remove from the site and premises. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.