My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAST -IN-PLACE CONCRETE <br />Section 03300 <br />15-1207 <br />intended to be used in this project and as listed in Part 2 of this specification. <br />C. Submit concrete mix design for each type of concrete on the project in accordance with CBC <br />Section 1905A.3. Mix design shall be signed by a California Registered Civil Engineer to <br />verify compliance with CBC Section 1905A.2. <br />D. Submit Shop Drawings: Proposed location of constructions and cold joints when different or <br />in addition to those shown on the drawings. <br />E. Transit -mix delivery slips: <br />1. Keep a record at the job site showing time and place of each pour of concrete, together <br />with transit -mix delivery slip certifying contents of the pour in accordance with the CBC. <br />2. Make all records available to the Architect and Division of the State Architect for their <br />inspection upon request. <br />3. Upon completion of this portion of the work, deliver all records and the delivery slips to <br />the Architect. <br />4. Batch Plant Certificates: Include with delivery of each load of concrete. Provide <br />certificates to the Testing Agency and the Architect/Engineer as separate submittals. <br />Concrete delivered to the site without such certificate shall be rejected and returned to <br />the plant. Each certificate shall include all information specified in Article SOURCE <br />QUALITY CONTROL below. <br />F. Submit executed Guarantee of Contractor/Subcontractor per Article 1.05. <br />1.05 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />B. Submit fully executed Guarantee with submittal package required by Article 1.04. See Part 3 <br />of this specification regarding concrete finishing and defective concrete. In addition, provide <br />Moisture Barrier Admixture Manufacturer's (2) year warranty against moisture related failure, <br />including all finish floor materials and labor. <br />1.06 REFERENCES AND STANDARDS <br />A. California Building Code (CBC), current edition, as adopted by the Division of the State <br />Architect. <br />B. ACI Standards, ACI 211. 1, ACI 318-08, ACI 302, 1R-04, ACI 301-05, ACI 305R-99, ACI <br />306R-02, ACI 308-98. <br />C. ASTM C-04, Specification for Ready -mixed concrete. <br />1.07 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.