Laserfiche WebLink
CAST -IN-PLACE CONCRETE <br />Section 03300 <br />15-1207 <br />1850 Gateway Blvd., Suite 230 <br />Concord, CA 94520 <br />Attn: Jennifer Chambers <br />(800) 490-3657 x 208 <br />If the Contractor requests an alternate testing lab, the Contractor must submit the <br />name of the proposed testing lab, the lab's qualifications, proposed testing procedures <br />and proposed scheduled tests 45 days prior to first scheduled test. The Architect <br />reserves the right to reject the testing lab due to lack of experience or qualification. <br />Following testing, the test results must be submitted to the Contractor, Architect, <br />Owner's Representative, and Flooring Installer(s). Installation of floor finishes within <br />these areas required to be tested may not begin without review and approval of the <br />testing results. <br />END OF SECTION <br />1:11207 lincoln as - cafeteria replacement14.06 projmanlconsultantslstruct103300 cast in place concrete w asg edits 15-0623.docx <br />Last Updated: July 31, 2013 <br />12 <br />