My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCRETE MASONRY UNIT <br />Section 04300 <br />15-1207 <br />C. Compressive strength of grout at 28 days shall be not less than 2000 psi with 6 sacks <br />cement minimum per cubic yard. See structural drawings for specified grout strength. Grout <br />slump to be 8" to 11 ", W/C equal to or greater than 0.7. No water reducing admixtures will be <br />approved. <br />D. Thoroughly mix grout ingredients in quantities needed for immediate use. <br />E. Mix shall contain specified grout admixtures in accordance with manufacturer's instructions: <br />1. SikaGrout Aid to be added at a rate of 1 Ib. per 100 Ib. of cementitious materials per <br />manufacturer's recommendations <br />2. Provide for uniformity of mix. Regardless of whether grout is job -mixed or plant -mixed, <br />admixture shall be added per manufacturer's requirements. Admixture must be <br />combined with water to form a slurry which is then added to the mix in order to avoid <br />"balling" and to get proper distribution of the admixture within the mix. <br />F. Do not use anti -freeze compounds to lower the freezing point of grout. <br />G. Grout shall not be used more than 90 minutes after initial mixing water has been added to dry <br />ingredients at the jobsite. <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. Verify that field conditions are acceptable and are ready to receive work: <br />1. That foundation surface is level to permit the initial bed joint within a range of % to 1 <br />inch. <br />2. That edge is true to line to permit projection of masonry to less than % inch. <br />3. That projecting dowels are free from loose scale, dirt, concrete or other bond -inhibiting <br />substances. <br />B. Verify items provided by other Sections of work are properly sized and located. <br />C. Verify that built-in items are in proper location, and ready for roughing into masonry work. <br />D. Beginning of installation means installer accepts existing conditions. <br />3.02 PREPARATION AND PROTECTION <br />A. Direct and coordinate placement of metal anchors supplied to other Sections. <br />B. Provide temporary bracing during installation of masonry work. Maintain in place until <br />building structure provides permanent bracing. <br />C. If rain is anticipated, cover the top of incomplete CMU construction as required to prevent the <br />�7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.