Laserfiche WebLink
STRUCTURAL STEEL <br />Section 05100 <br />15-1207 <br />in pertinent sections of Division 01. <br />3.08 CLEANING AND PROTECTION <br />A. Clean all surfaces upon completion of erection leave free of grime and dirt. Remove unused <br />materials, tools, equipment and debris from the premises and leave surfaces broom clean. <br />B. Protect work from damage by subsequent operations. <br />END OF SECTION <br />is U20711ncoln es - cafeteria replacement14.06 projmanlconsultantsVincoln es struct specs 15-0623\05100_structural steel w asg <br />edits 15-0623.docx <br />Last Update: March 15, 2011 <br />15 <br />