My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRUCTURAL STEEL <br />Section 05100 <br />15-1207 <br />2. Welder Qualifications: Welding inspector shall verify that all the welders are properly <br />qualified prior to steel fabrication and state the qualifications of each welder in the <br />welding inspection report. <br />3. Welding Inspection: Continuous inspection required unless otherwise noted below. <br />Comply with requirements of AWS D1.1 <br />a. Welding Inspector shall check all welds, materials, equipment and procedures. <br />b. Welding Inspector shall provide reports certifying the welding is as required <br />and has been done in conformity with the plans, specifications and codes. <br />C. Welding Inspector shall use radiographic, ultrasonic, magnetic particle, or any <br />other necessary aid to visual inspection to assure adequacy of welds. <br />4. Periodic Inspection Acceptable: <br />a. Single pass fillet welds not exceeding 5116. <br />b. Welding of studs to beams. <br />3.06 FIELD QUALITY CONTROL <br />A. The independent Testing Agency will perform field quality control tests, as specified in <br />pertinent sections of Division 01. <br />B. Field Welding Inspection: Conform to all requirements of Article 2.08 SOURCE QUALITY <br />CONTROL. <br />3.07 ADJUSTING <br />A. Touch-up damaged finishes with compatible specified primer, or cold galvanized paint at <br />galvanized finish.. <br />B. Replace all defective work at Contractor's expense. <br />C. Replace defective or damaged work with conforming work. <br />D. Straighten materials by means that will not injure the materials. <br />E. Replace defective or damaged work which cannot be corrected in the field with new work, or <br />return defective items to the shop for repair. <br />F. Architect/Engineer shall review all proposals for the repair or replacement of damaged, <br />defective, or missing work. <br />G. Contractor to pay expenses incurred by Owner for Architect/Engineer's costs for (re -)design <br />and obtaining approvals of Authorities Having Jurisdiction (AHJ) necessitated by incomplete, <br />inefficiently scheduled, improperly performed, defective or nonconforming work, as specified <br />in pertinent sections of Division 01. <br />H. Contractor to pay expenses due to re -testing and re -inspection necessitated by incomplete, <br />inefficiently scheduled, improperly performed, defective or nonconforming work, as specified <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.