Laserfiche WebLink
BUILDING INSULATION <br />Section 07210 <br />15-1207 <br />and voids. Cut and pack around pipes, conduits, ducts, etc. <br />3.06 VAPOR RETARDERS <br />A. Maintain vapor retarder integrity by tightly butting adjacent insulation. Repair punctures or <br />tears in vapor retarder facing by taping. Follow tape manufacturer's application <br />recommendations. <br />3.07 PROTECTION <br />A. Protect insulation from damage and from becoming wet before, during and after installation. <br />END OF SECTION <br />iA1207 lincoln as - cafeteria replacement14.06 projman107210 building insulation.doc <br />Last Updated., October 8, 2014 <br />A <br />