My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER VAPOR REDUCTION SYSTEM <br />Section 07260 <br />15-1207 <br />PART 1 - GENERAL <br />1.01 INCLUSION OF OTHER CONTRACT DOCUMENTS <br />A. The General Conditions, Supplementary Conditions and Division 1 are fully applicable to this <br />Section, as if repeated herein. <br />1.02 RELATED WORK SPECIFIED ELSEWHERE <br />A. Section 01350, Environmental Requirements. <br />B. Section 03300, Cast -In -Place Concrete <br />C. Section 09650, Resilient Flooring & Base <br />1.03 QUALITY ASSURANCE <br />A. Use only new materials and products, unless existing materials or products are specifically <br />shown otherwise on the Drawings to be salvaged and re -used. <br />B. Use materials and products of one manufacturer whenever possible. <br />C. All materials, workmanship and installation are to be observed by the Owner's Inspector of <br />Record. Work not so inspected is subject to uncovering and replacement. <br />D. Installer: <br />1. Installer shall be certified by the manufacturer and experienced in surface preparation <br />and application of the material and subject to inspection and control of the <br />manufacturer. <br />2. Installer shall have no less than five (5) years experience installing fluid based coating <br />systems. <br />E. Manufacturer Qualifications: <br />1. Manufacturer shall have no less than ten (10) years experience in manufacturing water <br />vapor reduction systems. The water vapor reduction system must be specifically <br />formulated and marketed for water vapor reduction and alkalinity control without <br />change of system design for a minimum period of five (5) years. <br />2. Warranty program covering installation workmanship and material performance for 10 <br />years at no additional cost to the Owner. <br />F. Testing: <br />1. Manufacturer must provide Independent lab test reports documenting performance per <br />the following: <br />a. ASTM E 96; Water Vapor Transmission (wet method) Performance shall be <br />documented by an independent testing laboratory at a minimum of 94% water <br />vapor transmission reduction compared to untreated concrete. <br />b. ASTM D 1308; Insensitivity to alkaline environment up to, and including, pH 14. <br />A 14 day test is required with no degradation of sample reported. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.