Laserfiche WebLink
THERMOPLASTIC MEMBRANE <br />ROOFING - ADHERED <br />Section 07541 <br />15-1207 <br />1. Roof drains and scuppers have been reconditioned or replaced and installed properly. <br />2. Roof curbs, nailers, equipment supports, vents and other roof penetrations are properly <br />secured and prepared to receive new roofing materials. <br />3. All surfaces are smooth and free of dirt, debris and incompatible materials. <br />4. All roof surfaces shall be free of water, ice and snow. <br />3.03 SUBSTRATE PREPARATION <br />The roof deck and existing roof construction must be structurally sound to provide support for <br />the new roof system. The Applicator shall load materials on the rooftop in such a manner as <br />to eliminate risk of deck overload due to concentrated weight. The Owner's Representative <br />shall ensure that the roof deck is secured to the structural framing according to local building <br />code and in such a manner as to resist all anticipated wind loads in that location. <br />A. New Construction <br />1. Steel Deck: <br />a) FM approved steel deck - The roof deck shall be 22 gauge (minimum) conforming to <br />meet the latest revision of FM's Loss Prevention Data Sheet 1-29 and the local code's <br />current requirements. <br />b) Non -FM approved steel deck - The roof deck shall be 24 gauge (minimum) grade D <br />and shall conform and be installed to the local code's current requirements. <br />2. Wood Deck: <br />a) The roof deck shall be minimum 1-1/2 inch thick lumber or 15/32 inch thick plywood. <br />Deck shall be installed according to local code requirements. Contact Sika Sarnafil <br />Technical for fastening patterns and methods. <br />3. Insulating Fill Substrate: <br />The lightweight fill shall be installed by a trained lightweight fill Applicator in accordance <br />with the lightweight fill manufacturer's requirements and industry practice. The surface <br />shall be free from dust and loose fragments, be smooth, level, and free from moisture. <br />Sharp ridges or other projections above the surface shall be removed before roofing. <br />Proper venting as recommended by the roof deck manufacturer shall be provided. An <br />insulation recover board may be required as a substrate to adhere to. Fastening for <br />recover board shall be into structural deck below insulating fill (see steel/concrete deck <br />requirements). <br />B. Reroofing with Removal of Existing Bitumen Roofing <br />General Criteria <br />All existing roofing, base flashing, deteriorated wood blocking or deteriorated metal flashings <br />shall be removed. Remove only that amount of roofing and flashing which can be made <br />weathertight with new materials during a one -day period or before the onset of inclement <br />weather. <br />16 <br />