My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THERMOPLASTIC MEMBRANE <br />ROOFING - ADHERED <br />Section 07541 <br />15-1207 <br />stainless steel. Mixing metal types and methods of contact shall be assembled in such a <br />manner as to avoid galvanic corrosion. Fasteners for attachment of metal to masonry shall <br />be expansion type fasteners with stainless steel pins. All concrete fasteners and anchors <br />shall have a minimum embedment of 1-1/4 inch and shall be approved for such use by the <br />fastener manufacturer. All miscellaneous wood fasteners and anchors used for flashings <br />shall have a minimum embedment of 1 inch and shall be approved for such use by the <br />fastener manufacturer. <br />2.12 RELATED MATERIALS <br />A. Wood Nailer <br />Wood nailers shall be installed at the perimeter of the entire roof and around such other roof <br />projections and penetrations as specified on project drawings. Thickness of nailers must <br />match the insulation thickness to achieve a smooth transition. Wood nailers shall conform to <br />Factory Mutual Loss Prevention Data Sheet 1-49. All wood shall have a maximum moisture <br />content of 19 percent by weight on a dry -weight basis. <br />Note: Wood nailers or wood blocking for snow protection system shall be installed prior to the <br />installation of the roof membrane whenever possible. <br />B. Plywood <br />When bonding directly to plywood, a minimum 1/2 inch CDX (C side out), smooth -surfaced <br />exterior grade plywood with exterior grade glue shall be used. Rough -surfaced plywood or <br />high fastener heads will require the use of Sarnafelt behind the flashing membrane. Plywood <br />shall have a maximum moisture content of 19 percent by weight on a dry weight basis. <br />PART 3 - EXECUTION <br />3.01 PRE -CONSTRUCTION CONFERENCE <br />A. The Applicator, Owner's Representative/Designer and Manufacturer(s) shall attend a pre - <br />construction conference. <br />B. The meeting shall discuss all aspects of the project including but not limited to: <br />1. Safety <br />2. Set up <br />3. Construction schedule <br />4. Contract conditions <br />5. Coordination of the work <br />3.02 SUBSTRATE CONDITION <br />A. Applicator shall be responsible for acceptance or provision of proper substrate to receive new <br />roofing materials. <br />B. Applicator shall verify that the work done under related sections meets the following <br />conditions: <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.