Laserfiche WebLink
From:RainforthGrauArchRects To -3232227 11/0312015 14:13 #►007 P.0061006 <br />I. DO NOT TRIM POSITIVE PRESSURE RATED DOORS FOR WIDTH <br />_- <br />„ - E; J. Resect or refinish any doors that recuired site alteration <br />3.03 PROTECTION <br />A. Protect work and materials of this Section prior to and during installation, and protect the <br />installed work and materials of other trades. <br />B. In the event of damage, immediately make all repairs and replacements necessary to the <br />approval of the Architect and at no additional cost to the Owner. <br />END OF SECTION <br />i.IliO ' tinCWn es - cafieWU rWaMMOnM.06 PM#Mn108210 wood doors.doa <br />Last updated: Downbw 112012 <br />EM <br />0 <br />