Laserfiche WebLink
GYPSUM WALLBOARD <br />Section 09250 <br />15-1207 <br />D. Submit executed Guarantee of Contractor/Subcontractor per Article 1.05. <br />1.05 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />B. Submit fully executed Guarantee with submittal package required by Article 1.04. <br />1.06 REFERENCES AND STANDARDS <br />A. California Building Code (CBC), current edition, as adopted by the California Division of the <br />State Architect (DSA). <br />B. California Green Building Standards Code, current edition, as adopted by the California <br />Division of the State Architect (DSA). <br />C. Gypsum Association Publication GA -600-2009, Fire Resistance Design Manual. <br />D. Gypsum Association Publication GA -214-07, Recommended Levels of Gypsum Board Finish. <br />E. Gypsum Association Publication GA -216-07, Specifications for "Application and Finishing of <br />Gypsum Panel Products". <br />F. Underwriters' Laboratories, Fire Resistance Directory, latest edition. <br />G. ASTM C11, Standard Terminology Relating to Gypsum and related Building Materials and <br />Systems. <br />H ASTM C 840, Standard Specification for Application and Finish of Gypsum Board. <br />I. Master Painters Glossary, Painting and decorating Contractors of America. <br />1.07 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />C. Transport, store and handle in strict accord with the manufacturer's written recommendations. <br />Materials are to be neatly stacked flat, avoiding undue sag or damaged to board surfaces or <br />edges. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />1.08 PROJECT CONDITIONS <br />A. Do not install wallboard or joint compounds when building temperature is below 55 degrees F <br />2 <br />