My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LINOLEUM FLOOR COVERING <br />Section 09654 <br />15-1207 <br />G. In the event of discrepancy, immediately notify the Architect. Do not proceed with installation <br />of flooring or base in areas of discrepancy until all such discrepancies have been resolved. <br />H. Beginning of installation will imply acceptance of sub -floor by installer. <br />3.03 ADHESIVE SYSTEM APPLICATION <br />A. Installation of Flooring Adhesive System shall be executed using manufacturer's approved <br />materials and approved installation methodologies. <br />B. Follow adhesive manufacturer's directions for mixing and applying. Cover surface evenly. Do <br />not exceed working area or time limits recommended by manufacturer. <br />3.04 INSTALLATION OF SHEET FLOORING <br />A. Install flooring in strict accordance with manufacturer's recommendations. <br />B. Install flooring wall to wall before the installation of floor -set cabinets, casework, furniture, <br />equipment, movable partitions, etc. Extend flooring into toe spaces, door recesses, closets <br />and similar openings as shown on the Drawings. <br />C. Install flooring on pan -type floor access and utility covers when present. Maintain continuity of <br />color and pattern within pieces of flooring installed on these covers. Adhere flooring to the <br />subfloor around covers and to covers. <br />D. Scribe, cut, and fit or flash cover to permanent fixtures, columns, walls, partitions, pipes, <br />outlets, and built-in furniture and cabinets. <br />E. Adhere flooring to the subfloor without cracks, voids, raising and puckering at the seams. Roll <br />with a 100 -pound roller in the field areas. Hand -roll flooring at the perimeter and the seams to <br />assure adhesion. <br />F. Lay flooring to provide a minimum number of seams. Avoid cross seams, filler pieces and <br />strips. Match edges for color shading and pattern at the seams in compliance with the <br />manufacturer's recommendations. <br />G. Install flooring with adhesives, tools and procedures in strict accordance with the <br />manufacturer's written instructions. Observe the recommended adhesive trowel notching, <br />open times and working times. <br />H. Prepare heat -welded seams with special routing tool supplied for this purpose and heat weld <br />with linoleum welding rod in seams. Use methods and sequence of work in conformance with <br />written instructions of the flooring manufacturer. Finish all seams flush and free from voids, <br />recesses and raised areas. <br />Provide integral self cove wall base where shown on the drawings, including cove fillet support <br />strip and top edge cap trim. Construct self cove base in accordance with the flooring <br />manufacturer's instructions. Heat -weld seams as specified for those on the floor. <br />1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.