Laserfiche WebLink
RESILIENT SHEET LINOLEUM <br />MULTI-PURPOSE & SPORT FLOORING <br />SECTION 09656 <br />15-1207 <br />B. Final wax / finish application to be done by prime contractor turnover cleaning crew and per <br />school district standards following future use and finish guidelines for linoleum flooring. <br />1. DO NOT wax, finish, or in any way detergent clean floor until game lines have cured. <br />2. Follow 3 athletic shoe, 7 days to play, and 30 days to wash with detergent guidelines as <br />set by floor installation technicians for guidelines on paint cure times. <br />END OF SECTION <br />0 <br />