My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014469
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100205
>
SU0014469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:51:29 PM
Creation date
10/15/2021 3:46:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014469
PE
2608
FACILITY_NAME
PA-2100205
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOtlNTAIN HOUSE SPECIFIC Pi.AN 11 <br /> pavement sections andror safety improvements Img.,standard pavement <br /> widths and paved s hoLAders)when it is determined by the County to be the <br /> primary new traffic contributor,on rural roads,Includ)ng Bethany,Kelso. <br /> Hansen,Von Sosten,Reeve,and Middle Roads,and Tr,1cy Rokileve rd where <br /> necessary to alleviate additional traffic caused by the project within the <br /> County. <br /> B. MHCSd_Construction Truck Requirements. All implementing projects shall <br /> comply with the requirements of the MHCSD Construction Truck <br /> Management Plan, <br /> T. Grant Line Road. When traffic reaches 5000 ADT,Grant I_Ine Road(from <br /> Byron Road to 1-680)shall be studied to determine whether it meets current <br /> road standards or has deficiencies not Identified under previous model <br /> assumptions. The study shall be prepoied by the MHCSD and approved by <br /> the County. <br /> 9.5 ARTERIAL INTERSECTIONS <br /> Master Plan Summary <br /> The Master Plan requires that safe WerseCtii4rms be provided through properly designed <br /> signaJ"tion and lane channelization at appropriate locatlon5. Intersectlanr,driveways, <br /> and minor access points on existing County Arterials must be spaced at least 1 IS mile <br /> (560 feet)apart. Existing driveways and access points may remaln,but Should he <br /> ralocaterl Ifposslble to meet the minimum spacing requirement. Proposed intersections. <br /> driveways,and minor acca8s polno that cannot orhieve'IM mile(660 feet}spacing may <br /> be permitted as determined by a traffic study or other applicable study. No new tkuilding or <br /> increased traffic uses are allowed on existing access poirds. <br /> She community will,to the axtent of its Fair share,provide slgnalization and channel"rzation <br /> at County Arterial intersections within the traffic Impact area of the community, Each <br /> Specific Plain wall include provisions for necessary intersection Improvements required tc <br /> serve the cumulative tralhc of the community. <br /> Man Description <br /> Ttme MHCSD Transportation Improvement Fee has already Identified the major <br /> improvements,costs and fair share Obligations for all major transportation far,ilitles for <br /> SPII. As a supplement to these adopted programs,the MHCSD has performed an <br /> additional traffic study as part of SPII which confirms the adequacy of these improvemerrt <br /> programs and funding mechanisms. The MHCSD Traffic Study further confirmed+midi <br /> components of the community build-out system are Iikep to be oornpletted as part of the <br /> implementation of SPII,as depicted on Figure 9.1. <br /> As part of implemerding projects contained within SPII,the WHCSD will perform detailed <br /> traffic stu6es to Idermtlfy the specific improvements and related phasing of SPI1 roadways <br /> which may be necessary to support such Implementing projects, As part of the approval of <br /> these implementing projects the MHCSD will candltlr)ns such approvals to implement,as <br /> warranted on a phased basis,the specific system improvements that the projects triggers, <br /> consistent with Communi y Approvals, Since the specific transportation triggers for the <br /> community transportation improvements Mll be determined as part of implementing project <br /> approvals,the specific tuggers contalnied wlthln the Master Plan will be <br /> pt d.45uperseded by subsequent MHCS0 phasing and triggerdeterrInatiosis <br /> CHAPTER NINE TRANSPORTATION AND CIRCULATION! PAGE 0 t <br /> RENisad 11Y5WI0 <br /> Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.