Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN II <br /> Plan Den0ption <br /> The MHCSD Transportation Improvement Fee has already ldentl%d the major <br /> impr ayements,omfs and faiT share obligations for all major transportation facilities for <br /> 5P1i. As a supptement to these adapted programs,the MHCSD has peflormed an <br /> add itlonaI trade study as part of SPII which confirms the adequacy of these improvement <br /> programs and funding mechanisms. The MHCSD Traffic Study Further confirmed which <br /> components of the community build-out system are Wely to be completed as part of the <br /> implementation of SPI 1.as depicted on Figure 9.1. <br /> As part of implementing projects contained within SPII,the MHCSD wi11 perfarm detailed <br /> traffic studies to identify the specific improvements and related phasing of SPII roadways <br /> which may be necessary to support such implementing projects. As part of the approval of <br /> these implementing projects t#ie MHCSDwlil Conciig4n suc#i approvals to implement, as <br /> warranted on a phased basis,the specific system improvements that the projects triggers, <br /> consistent with Gore munity Approvals_ Since the specific transportation triggers for the <br /> community transportation improvements will be determined as part of implementing project <br /> approvals,the specific triggers contained within the Master Plan wl11 be <br /> r,wpem�edsuptrseded by subsequent MHCSD phasing and trigger determinatfons. <br /> Spill Implementaflun Measures <br /> 1. Community Roadway Impravemerrts Phasfnsa Requirements. The specific <br /> Improvement phasing requirements contained within Master Specific Plan <br /> Tables 9.11 9.2r and 9A are specifically s4upffrcededsuper5eded by the <br /> requirements and provisions contained within Specific Plan 11,tha <br /> improvements described in Tables 5.15-20,6.15-21 and 5.15.22 of the <br /> Specific Plan 11 Expanded Initial Study,the MHCSD Roadway Improvement <br /> Plan,the MHCSD Mountain House Transportation Improvement Fee <br /> Ordinance and Technical Report Dated Mara,19.2000,the appticable <br /> provisions of the Master Acquisition and Reim bursementAgreement <br /> between the MHCSD and Trim wk-C—o it;muti dies,LL-Cthe Master DevelaoeT, <br /> and Sec-ion 3.6.12 of the Master Plan Develo pm ant Agreement hetvveen San <br /> Joaquin County and Trkpark eirnRuFikiies,"''the Master Developer. The <br /> timing and extent of all project specific phased improvements of community <br /> roadways shall he determined as part cf MHCSD Traffic Studies for all <br /> implementing projects. <br /> 2. MACSD Fundinp Requirements. Aft implementing projects shall comply with <br /> the requirements of the MHCSD Transportation Improvement Fee Ordinance <br /> and Technical Report Dated March 19,2000,and Sectlon 3,6.12 of the Master <br /> Pian Development Agreement between San Joaquin County and TFilmatk <br /> Comequoitips.LLGthe Master Develoaer. <br /> 3. MHCSD Deakin and Construction Requirements. All implementing projects <br /> shall comply with the applIca bto provisions of the MHCSD Development <br /> Standards(see Section 1: General Design Requirements a0d 30010 2. <br /> Street Design Standards), <br /> 4. MHCSD Renigu Requirements. All iTrtplemertting pubITE improvement <br /> projects shall comply with the applicable provisians of the MHCSD Deslgn <br /> Manual,as amended(see Chapter Three:Streetscape and Chapter Nine' <br /> Entries). <br /> CHAPTER NIHF TRANSPORTATION AND Q R 0 L)LATIGN PAGE 9 T <br /> Resolution Template 01/2017 <br />