My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014470
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100206
>
SU0014470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:48:57 PM
Creation date
10/15/2021 3:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014470
PE
2638
FACILITY_NAME
PA-2100206
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN II <br />The Mountain House Creek flood control improvements have previously been constructed <br />as part of the development of Specific Plan I, including the outfall into Old giver. <br />Improvements to the exlsting Levee and within the FEMA flood zone, to remove deve]aping <br />portions from the flood zone, will be phased as necessary to provide flood protection from <br />any given phase north of Byron Road. Specific phasing and improvements plans will be <br />approved by the MHCSiJ prior to processing of changes to the flood insurance rate maps <br />with FEIVIA. <br />SPIE Implementation Measures <br />Phasing and Coats. All Implementing projects shall comply with the <br />applicable requirements of the PublIc Financing Plan and Technical Report, <br />Master Acquisitfon and Reim bursementAgreement between the MHCSR and <br />Trimark Corn munMas , Master Plan Developraeint Agreement between San <br />Joaquin County and fifiFR Flf CR tssusMfes lathe tMaster aevelor�er, <br />MHCSD Capfta! Improvement Program, and applicable development fee <br />Ordinances. <br />Flood Protection PhasingPlans. Specific flood control phasing and <br />Improvement plans far areas contained with In the FEMA 100 year flood <br />areas, sh; II be approved by the IVIHCSD Prior to processing of permits to <br />amend FEMA Maps. <br />16,10 OPERATIONS AND MAINTENANCE <br />Master Plan Summary <br />Storm drainage and flood protection facklitles will be mairltainO by the MHG5D. A <br />channel maintenance plan will be prepared prior to the suhmittal of the fiml development <br />permit and will include a program to monitorsedimentatton buildup for Mountain House <br />Creek and drainage channels. Maintenance pemanrtel, vehicles, and equipment may be <br />shared with other facility mairitenanw crews to achieve staffing efficiency and cost <br />reduclicos. These maintenance costs have been incorporated in the Fscal analysis <br />presenled In the PFP. <br />SPII Implementation Measures <br />Operations and Maintenance_ Ail Implementing projects shall comply with <br />the appllcahle requirements & the Public Financing Plan and Technical <br />Report, Maste r Acq u is i6 on and Rel mbutfsemant Agreement between the <br />MHCSD and Trimark Communities, Master Plan development Agreement <br />Gatween San Joaquin County and Trimark-Csmmun4tles-LLCthe Master <br />Dt velg er, MHCSD Capital Improvement Program, and applicable <br />development fee Ordinances. <br />CRAPTER FIFTEEN STOMIA DRXNAGE AND FLOOD 11114TEC10N PAGE 15.15 <br />Ravisad iY1 V200T <br />Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.