Laserfiche WebLink
does not allow the improvements, the improvement funds shall be deposited with the <br />MHCSD to be used as directed by the General Manager as described in the TIF program. <br />Subject to the requirements of the Mountain House Transportation Improvement Fee <br />Technical Report adopted by the MHCSD Board of Directors on April 11, 2000, and all <br />amendments thereof to date, widen or fund, as determined by the MHCSD, Grant Line <br />Road to four lanes from Great Valley Parkway to 1-580 freeway prior to issuance of the <br />2250th building permit beyond E, F and G. The developer shall improve and widen Grant <br />Line Road between the Alameda County line and its intersection with I-580. If Alameda <br />County does not allow the improvements to Grant Line Road, the developer shall deposit <br />with the MHCSD funds equivalent to the cost of the widening as listed in the TIF Report. <br />The MHCSD General Manager may use the funds to improve other regional roads as <br />determined by a traffic study and stated in the TIF Technical Report and approved by the <br />General Manager. If Grant Line Road in Alameda County is not widened, an interim <br />design showing the transition from 4 lanes to two lanes within the boundary of Mountain <br />House shall be submitted to the MHCSD for review and approval. <br />Fund, as determined by the MHCSD, Grant Line Road to four lanes from Great Valley <br />Parkway to 1-580 freeway prior to issuance of the 2250th building permit beyond E, F and <br />G. The developer shall fund the improvement and widening of Grant Line Road between <br />the Alameda County line and its intersection with 1-580. If Alameda County does not <br />allow the improvements to Grant Line Road, the developer shall deposit with the MHCSD <br />funds equivalent to the cost of the widening as listed in the TIF Report. The MHCSD <br />General Manager may use the funds to improve other regional roads as determined by a <br />traffic study and stated in the TIF Technical Report and approved by the General <br />Manager. If Grant Line Road in Alameda County is not widened, an interim design <br />showing the transition from four lanes to two lanes within the boundaries of Mountain <br />House shall be submitted to the MHCSD for review and approval. <br />k. Prior to the issuance of the first residential building permit north of Byron Road one of the <br />three permanent Byron Road crossings shall be constructed. Prior to the issuance of the <br />1300th residential building permit north of Byron Road, the second permanent Byron <br />Road crossing shall be constructed. Prior to the 2700th residential building permit north <br />of Byron Road, the third permanent Byron Road crossing shall be constructed. If, at any <br />time, frequent regularly scheduled train service is established on the Union Pacific Line <br />along Byron Road, no further Final Subdivision maps containing residential development <br />will be approved until the Central Parkway flyover is constructed. <br />Tentative maps with frontage on Great Valley Parkway shall install full frontage <br />improvements. (The ultimate complete street section). <br />m. Prior to the first final map, if the landscaping or any other portion of the 1-205 interchange <br />improvement project has not been completed, the developer shall construct or pay the <br />fair share of the remaining improvements based on the number of dwelling units in the <br />project vs. the number of units in Mountain House. <br />34. Deferring Improvements: It is possible that the MHCSD may allow the deferring of street <br />improvements (including utilities). If the developer wishes to pursue this option, then a formal <br />written request shall be submitted to the MHCSD after the Tentative Map has been approved but <br />before the approval of the Final Map. The request should define those street improvements that <br />the developer wishes to defer. If the MHCSD should approve the deferment, it will be conditioned <br />in the developer agreeing to construct the deferred improvements within a specified future time <br />period and that a security, such as a bond, be provided the MHCSD guaranteeing the developer's <br />performance. <br />35. If the property shown on the Tentative Map is to be developed in phases, then a subdivision <br />agreement and appropriate bonding shall be executed between the MHCSD and the developer <br />for each phase prior to the approval of the Final Map. <br />Resolution Template 01/2017 <br />