My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014470
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100206
>
SU0014470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:48:57 PM
Creation date
10/15/2021 3:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014470
PE
2638
FACILITY_NAME
PA-2100206
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manager. Design, size and location shall be provided consistent with the most recent update of <br />the CFF Plan and approved by the MHCSD. Upon acceptance, the Facilities shall be dedicated to <br />the MHCSD. This condition can be satisfied by an agreement acceptable to the MHCSD that the <br />required facilities will be constructed on this schedule. <br />30. Police Substation: Construction of approximately 17,000 s.f. Phase One Police Substation shall <br />begin prior to issuance of the 7500th residential permit in the Mountain House Master Plan area. <br />The exact size shall be as determined by the MHCSD General Manager. Completion of the <br />Facilities shall be completed within eighteen months of commencement of construction. Design, <br />size and location shall be provided consistent with the CFF Plan, Community Approvals and <br />approved by the MHCSD. Upon acceptance, the Facilities shall be dedicated to the MHCSD. This <br />condition can be satisfied by an agreement acceptable to the MHCSD that the required facilities <br />will be constructed on this schedule. <br />31. Temporary Turnarounds: All streets will require temporary turnarounds unless waived by the <br />MHCSD General Manager and shall be shown on the Improvement Plans. <br />32. Recyclable Construction Waste: Recycling of construction wastes, such as wood and metal, <br />shall be made part of the improvement plans and construction specifications for contractors in <br />compliance with MHCSD requirements. Condition shall be met before approval of final maps. <br />33. Traffic and Transportation: <br />a. The subdivider shall improve all streets shown on the Tentative Map and other <br />transportation improvements as stated in the following conditions. The street <br />improvements shall include all street pavement, curbs, gutters, sidewalks, landscaping, <br />lighting, signs, traffic signals when warranted, underground utilities, etc. The MHCSD <br />may allow phased improvements subject to subdivision agreement or bonding. All the <br />building permit numbers referred to in the following conditions are in addition to E, F and <br />G unless specifically noted under a condition. <br />b. The General Manager shall have the flexibility to implement alternative funding of the <br />various improvements subject to existing agreements and ordinances. <br />c. The following statement applies to all the conditions listed herein. If the MHCSD General <br />Manager determines that a facility or a street improvement is not yet warranted, the <br />General Manager may allow the facility or the street improvement to be delayed. The <br />developer shall provide adequate bonding to the MHCSD assuring construction at the <br />time the MHCSD General Manager determines the facility or the street to be required. <br />The MHCSD General Manager may also allow for phasing of an improvement, if bonding <br />is provided and it can be demonstrated with a traffic study, or other pertinent technical <br />analysis, to the satisfaction of the MHCSD General Manager that the full improvement is <br />not required for the phase of the Tracts being developed. Upon acceptance, the Facilities <br />shall be dedicated to the MHCSD. <br />d. The applicant shall comply with the results of the annual monitoring report prepared by <br />the MHCSD. <br />e. Install a signal at Mascot Blvd and Central Parkway prior to issuance of the 1200th <br />building permit beyond E, F and G. <br />f. Install a signal at De_Anza Blvd and Great Valley Parkway prior to issuance of the 1500th <br />building permit beyond E, F and G. <br />g. Install a signal at Great Valley Parkway and Kelso Road prior to issuance of the 1670th <br />building permit beyond E, F and G. <br />h. Fund as determined by the MHCSD, a signal at the intersection of Grant Line Road and <br />Altamont Pass Road and the addition of one lane on each approach to Grant Line Road <br />prior to issuance of the 2250th building permit beyond E, F and G. If Alameda County <br />Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.