Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for Gemco Ripon Truck Plaza Inc. as of September 29, <br /> 2021. <br /> Open violations from February 10, 2020 inspection <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#721 -Failed to provide corrosion protection for buried piping. <br /> The facility has buried piping and the SPCC plan states that piping is cathodically protected. Facility manager stated <br /> that the underground piping is fiberglass and that it is not cathodically protected. Pictures from previous inspections <br /> indicate that the piping is fiberglass. <br /> Facility transfer operations, pumping, and facility process. (1) Provide buried piping that is installed or replaced on or <br /> after August 16, 2002,with a protective wrapping and coating. You must also cathodically protect such buried piping <br /> installations or otherwise satisfy the corrosion protection standards for piping in part 280 of this chapter or a State <br /> program approved under part 281 of this chapter. If a section of buried line is exposed for any reason, you must <br /> carefully inspect it for deterioration. If you find corrosion damage,you must undertake additional examination and <br /> corrective action as indicated by the magnitude of the damage. <br /> The SPCC plan must address the correct corrosion protection for the buried piping.Amendment of this section will <br /> require a Professional Engineer Certification. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#725-Failed to conduct integrity and leak testing on buried piping any time it is worked on. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 11 of 11 <br />