Laserfiche WebLink
Complaint Status:. Ot <br />OS.1 .W (PM Date Abated: Abated By: o64 JA\42-tic-L <br /> <br />Complaint Investigation Summary Report #: 5105 <br />COMPLAINT ID: COPPAQCQZ Site Location: WESTBOUND HVVY 4, 3 MILES EAST OF TRACY BLVD <br />Received by: EE0000032 ALANIZ <br /> Received Date: 8/4/2021 Complaint Received Via: PHONE <br />Assigned To: EE0009857 VANG-LEE <br /> Assigned Date: 8/4/2021 <br />Program/Element Code 2546 - Release/Spill Response (excluding Joint Team) <br />Nature of complaint: <br />BIG RIG CRASHED INTO AN UNNAMED CANAL AND IS DISCHARGING FUEL INTO THE WATERWAY <br />PROPERTY INFORMATION <br />Property Name: MICKEY'S TRANSPOR'l EEC <br />Site Location HWY 4 District 003 - PATTI, TOM <br />STOCKTON, CA 95206 <br /> Location Code 01 - STOCKTON <br />Cross Street TRACY BLVD <br /> APN 13111008 <br />Activity Summary <br />Activity Date <br />08/04/2021 TIME SPENT: 7:12 AM-7:30 AM <br />Recorded by <br />ALANIZ <br />Received a page from the San Joaquin County General Hospital. A truck accident <br />caused the release of diesel into the slough. <br />Called Melissa Nissim, program coordinator, and updated her on the release. It <br />was determined the spill would be handled by the C person at 8:00 PM. <br />08/04/2021 Site visit spill clean up assistance, visited the site with K. Saetern, V. Vang-Lee <br />(EHD). The impacted truck was removed from the waterway, and initial spill clean <br />up was implemented. Several agencies were present onsite: Coast Guard, CPH, <br />Caltrans, Fish and Wildlife. The responsible party representatives and the retained <br />clean up contractor were also onsite. Under the Coast Guard and Fish and Wildlife <br />oversight, Ponder delineated the extent ot slough impact with hard boom. Ponder <br />Environmental removed some impacted vegetation which was containerized into a <br />20-yard bin which was transported temporarily to the Caltrans yard (for staging <br />until tomorrow). Sargent Crutchfield indicated that he intends to halt all additional <br />clean up for today, he indicated that he feels that Ponder Environmental doesn't <br />have all the appropriate equipment to continue. The site was adequately secured <br />with booms and delineated with cones, and all clean up was demobilized until the <br />following day (starting at 9 am). See V. Vang-Lee narrative for more details. <br />MANZO <br />5105. rpt Page 1 of 4