Laserfiche WebLink
Potential Rainfall = 13.5" (1.13 ft) <br /> Net Rainfall Recharge= 10.8" (0.9 ft). Most rainfall runoff from the impervious areas flow into the <br /> unlined stormwater infiltration pond which makes impermeable runoff, permeable. A 20% reduction of the <br /> Available Rainfall will be used for Net Rainfall Recharge for that impervious rainfall volume that does not <br /> flow to the unlined stormwater basin and/or is lost to evaporation. <br /> Pervious areas=65.6 ac: <br /> 1.13 ft x 325,851 gals/ac-ft x 65.6 ac x=2,415,468 gals (R1) <br /> Impervious areas= 83.7 ac <br /> 0.9 ft x 325,851 gals/ac-ft x 83.7 ac=24,546,356 gals runoff from impervious areas entering the <br /> stormwater basin and other pervious areas. (b) <br /> 149.5 ac x 0.9 ft= 134.6 ac-ft x 325,851 gals/ac-ft=43,843,252 gals rainfall directly as recharge(c) <br /> 13.5" - 10.8" =2.7" Lost to runoff from impervious areas and/or evaporation from impervious areas <br /> 2.7" x 27,154 gals/ac-in x 149.5 ac= 10,960,712 gals(d) <br /> (e)=24,546,356 gals(b)+43,843,252 gals(c)- 10,960,712 (d)=57,428,896(R2) <br /> R1 + R2 =R=2,415,468 gals+ 57,428,896 gals= 59,844,364 gals= 183.65 ac-ft <br /> III. NITRATE LOADING STUDY FINDINGS <br /> A. WASTEWATER FLOW VOLUME PROJECTIONS AND CHARACTERISTICS <br /> Wastewater Flow Volume Projections <br /> To determine nitrate-nitrogen loading from any project, wastewater flow volumes must be <br /> determined as accurately as possible, for the highest reasonable usage. Since the number of onsite <br /> employees, customers, visitors, etc. are quite variable over the course of any given year, flow <br /> volumes from restroom fixture counts will be used for both the nitrate loading and effluent <br /> disposal area design calculations. Ultimately, there are to be 500 onsite people during the crush <br /> season, which is approximately four to six months of the year. <br /> As referenced, septic tank effluent from all but three standalone buildings will be pumped to a <br /> centralized location east of the stormwater basin. The three buildings with standalone OWTS will <br /> be Buildings G, G2, and S. These Buildings currently have septic tanks and adjacent effluent <br /> disposal areas, which will remain. <br /> Found in Appendix E, is a list of fixture counts for each of the referenced Buildings. Taking the <br /> highest reasonable use to determine Average Daily Flow(ADF), usage from both toilet and urinal <br /> fixture units have been quantified for flow volumes during crush season; the busiest time of any <br /> Lyear. ets have been assigned 2 flushes per hour and urinals 4 flushes per hour over a 20 hr <br /> Page -6- <br /> Chesney Consulting <br />