My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0524783
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 4:31:19 PM
Creation date
11/1/2021 4:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524783
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0016638
FACILITY_NAME
GREIF STOCKTON
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
800 W CHURCH ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 feet laterally in all directions from the outside of the well boring,unless otherwise approved <br /> by the enforcing agency. <br /> The base shall be free of cracks, voids, and other significant defects likely to prevent water <br /> tightness. Contacts between the base and the annular seal, and the base and the well casing <br /> must be water tight and must not cause the failure of the well casing or annular seal. <br /> Where cement-based annular sealing material is used,the concrete base shall be poured before <br /> the annular seal has set, unless otherwise approved by the enforcing agency. <br /> E. Vaults. At the approval of the enforcing agency, the top of a cathodic protection well may be <br /> below ground surface because of traffic or other critical considerations. A watertight, <br /> structurally-sound vault, or equivalent feature, shall be installed to house the top of the well <br /> casing if it terminates below ground surface. <br /> The vault shall extend from the top of the annular seal to at least ground surface. In no case <br /> shall the top of the annular seal be more than 4 feet below ground surface. <br /> The vault shall contact the annular seal in a manner to form a watertight and structurally- <br /> sound connection. Contacts between the vault and the annular seal,and the vault and the well <br /> casing (if any), shall not fail, or cause the failure of the well casing or annular seal. <br /> Where cement-based annular sealing materials are used, the vault shall be set into or contact <br /> the annular sealing material before it sets, unless otherwise approved by the enforcing agency. <br /> If bentonite-based sealing material is used for the annular seal,the vault shall be set into the <br /> bentonite before it is fully hydrated. <br /> Cement-based sealing material shall be placed between the outer walls of the vault and the <br /> excavation into which it is placed to form a proper,structurally sound foundation for the vault, <br /> and to seal the space between the vault and excavation. <br /> Sealing material surrounding the vault shall extend from the top of the annular seal to ground <br /> surface,unless precluded in areas of freezing. If cement-based sealing material is used for both <br /> the annular seal and the space between the excavation and vault,the sealing material shall be <br /> emplaced in a"continuous pour." In other words,cement-based sealing material shall be placed <br /> between the vault and excavation and contact a cement-based annular seal before the annular <br /> seal has set. <br /> The vault cover or lid shall be watertight but shall allow the venting of gases. The lid shall be <br /> fitted with a security device to prevent unauthorized access and shall be clearly and <br /> permanently labeled "CATHODIC PROTECTION WELL." The vault and its lid shall be <br /> strong enough to support vehicular traffic where such traffic might occur. <br /> The top of the vault shall be set at grade, or above, so that drainage is away from the vault. <br /> The top of the casing contained within the vault shall be capped in accordance with <br /> requirements of Subsection B,above so that water,contaminants,and pollutants that may enter <br /> the vault will not enter the well casing. <br /> F. Protection From Vehicles. Protective steel posts,or the equivalent,shall be installed around <br /> a cathodic protection well casing where it is terminated above ground surface in areas of <br /> vehicular traffic. The posts shall be easily seen and shall protect the well from vehicular <br /> impact. <br /> -68- <br />
The URL can be used to link to this page
Your browser does not support the video tag.