My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
& was able to access again without any problem) we can overnight hard copies or a usb drive <br />including all plans & documents to your office, if manufacturer's cut sheets are still not the <br />correct ones, please advise specifically which ones are acceptable & which ones you are still <br />missing. <br />utas for the following were not submitted: <br />• tank STP sump and tank fill sump <br />Under Dispenser Containment —The application lists B-925x-FXL BD -AB but that is not <br />one of the part numbers on the Bravo B-9000 cut sheet. This cut sheet also states that <br />this is a single walled UDC. Will you be installing a single walled UDC? <br />Electrical penetrations F -17 -RR -D and F -10 -RR -D - not listed on the Bravo cut sheet <br />submitted. <br />• Franklin Fueling FF10X12HMX346 flex connect is not listed on the Flex-ing Flex <br />Connector cut sheet. Or is the end of this part supposed to be "...F346"? Then it woLA <br />fit something on this cut sheet. <br />3) Provide tank charts for the tanks being used. Please follow the link to access updated plans, see <br />sheets M.5.3.04, M.5.3.05, M.5.3.06. These page <br />with values that list the that list the dipstick value associated with the gallons in the tank. See <br />example below of a tank chart. There are multiple pages that list various values of the fuel level <br />and volume of the fuel. Sheets M.5.3.04, M.5.3.05, M.5.3.06 are diagrams of the tank with <br />details. <br /><image003.jpg> <br />4) The section on vacuum zones on M.5.3.09 lists vapor recovery under 87 Zone 1 only. Please <br />include documentation for 91 vapor recovery piping. 91 on this page only shows vacuum zones <br />for product (zone 5), vent (zone 6) and crossover (zone 7). Please follow the link to access <br />updated plans, see revised sheet M.5.3.0 (Detail D). The install plans in the link does not have a <br />page M.5.3.0. There are 5.3.0,, M.5.3.02, M.5.3.04, M.5.3.05, M.5.3.06, and M.5.3.09 but no <br />pages that are a plain Q <br />5) Provide line length information for verifying line leak detector compatibility. 1 don't see the <br />line length information on G.0.2.0. Please follow the link to access updated plans, see revised <br />sheet M.5.3.0 (Detail DSR). The install plans in the link does not have a page M.5.3.0. There are <br />M.77770? M S-04, M.5.3.05, M.5.3.06, and M.5.3.09 but no pages that are a plain <br />M.5.3.0 <br />6) Provide completed UPCF Underground Storage Tanks — Facility form (A) and UPCF <br />Underground Storage Tanks (B) —Tank (one form per tank). Can this be a condition that forms <br />for ust system/equipment installed will be submitted prior to final nn this one with <br />a sup jML <br />7) Tank sizes on the application does not match tank sizes in the installation plans. page 3 and 6 <br />of the application list that there will be two 20,000 gallon tanks and one 25,000 gallon tank. The <br />installation plans (page M.5.3.01) list two 25,000 gallon tanks and one 20,000 gallon tank. <br />Please clarify by updating the application or updating the install plans. <br />8) Striker plates are not shown on the tank section detail for the 8,000 gallon tank (M.5.6.03). <br />Striker plates or drop tube -mounted bottom protectors should be illustrated below all accessible <br />openings. <br />9) 1 wanted to verify: <br />a. All the tank fill sumps will have OPW spill containers, except for the Diesel only tanks <br />which will have both OPW and Franklin Fueling spill containers? <br />b. Will all the OPW spill containers be OPW 1-2100-EVR? This is the cut sheet submitted <br />but the listed part number on the application is PK2-40FLMP-S. Is that a packaged part <br />number that includes the 1-2100-EVR? <br />c. The install plans for the tank section details for OPW fill sumps show to look at A, B, C on <br />M.5.3.17, but that page only has A, D, E, F, G (no B or C). Are there B and C on an <br />updated page? <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.