Laserfiche WebLink
g. Brian Roth Sr. does not have an ICC Service Technician certification submitted. Required <br />certifications will follow shortly as soon as received from contractor Savidge <br />Construction Inc. <br />We would also like to respectfully request expedite review as well for this project. Upon receipt & <br />review, please advise, feel free to contact our office should you have any questions. <br />Thank you, greatly appreciate all your assistance regarding this project & look forward to obtain CUPA <br />Permit/Approved Plans, stay healthy & safe. <br />Sincerely, <br />Robert Velasco <br />A & S Engineering <br />28405 Sand Canyon Road, Suite "8" <br />Canyon Country, CA 91387 <br />Office #661-250-9300 <br />Fax #661-250-9333 <br />Cell #818-746-6986 <br />From: Presto, Carol [EHD] <cpresto@sigov.org> <br />Sent: Wednesday, March 17, 20213:58 PM <br />To: Robert Velasco <roberty@asengineer.com> <br />Cc:'ERey' <erev@asengineer.com>; isandoval@asengineer.com;'John Savidge' <br /><jsavid�e@onemain.com> <br />Subject: RE: SR0081541 - 2510 S. Hwy 99, Stockton - UST Install <br />Hello Robert, <br />Thank you for your patience. Please see comments below highlighted in blue. Items 7-9 are new items <br />I've added. <br />1) Complete manufacturer certifications were not submitted. Provide current contractor's <br />training certifications for installation and testing of all proposed UST equipment/components, <br />including tanks & sumps, flex connectors, piping, spill buckets, sump shields & lids, leak <br />detectors, and overfill prevention. A number of the attached certifications have expired and <br />there is not a certification for each part being installed. Please follow the link to access <br />certifications received from contractor, if certifications are still not the correct ones, please <br />advise specifically which ones are acceptable & which ones you are still missing. <br />Certification for the following are still needed: <br />• NOV - piping <br />• Franklin Fueling/Flex-ing - flex connectors <br />• Hosemaster—flex connectors <br />• Franklin Fueling—spill containers <br />• Fiberlite— water -tight shield <br />• Veeder Root — leak detectors <br />2) Provide manufacturer's cut sheets for all proposed UST system components, including piping, <br />flex connectors, STP & fill sumps, UDCs, vent sumps, penetrations, spill buckets, and overfill <br />prevention. I found a link in one of the emails but it says that it is an "invalid link". Please follow <br />the link to access manufacturer's cut sheets, if it still says that the link is invalid (which I checked <br />19 <br />