My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Office #661-250-9300 <br />Fax #661-250-9333 <br />Cell #818-746-6986 <br />From: Robert Velasco <RobertV@ASengineer.com> <br />Sent: Wednesday, April 15, 2020 2:41 PM <br />To: 'Rivera, Stacy' <srivera@sigov.org> <br />Subject: RE: SR0081541 - 2510 S. Hwy 99, Stockton - UST Install Deficiencies <br />Good afternoon Stacy, <br />Hope this e-mail finds you well in all aspects specially right now during these challenging times. Below please find the <br />link you may use to access the manufacturer's cut sheets & plans that have been updated as needed to address <br />comments received; <br />https://asengineering.sharefile.com/d-sld3dba8dc334a42a <br />Below please also find responses to comments received as well; <br />1) Page 3 of the Application for Underground Storage Tank Installation Permit: Contractor information and <br />Fire Permit information were not included. Will be included as soon as information becomes available <br />2) Pages 4-8 of the Application for Underground Storage Tank Installation Permit were left blank. Will <br />follow shortly <br />3) Provide current contractor's training certifications for installation and testing of all proposed UST <br />equipment/components. Will be provided as soon as it becomes available <br />4) Provide manufacturer's cut sheets for all proposed UST system components. Provided, follow link <br />5) Provide tank charts for the tanks being used. See Sheets M5.3.04, M5.3.05, M5.3.06, & M5.6.03 <br />6) Submit a work plan for enhanced leak detection (ELD) testing, to be conducted by a properly licensed <br />individual. Will be provided as soon as it becomes available <br />7) Provide a diagram identifying the vacuum zones that will be used for piping monitoring. See Sheet <br />M5.3.09 <br />8) Provide line length information for verifying line leak detector compatibility. See Sheet G.0.2.0 <br />9) Provide a drawing indicating the locations of all water wells, septic systems, and storm drains. See <br />Sheet G.0.2.0 <br />10) Provide completed UPCF Underground Storage Tanks — Facility form (A) and UPCF Underground <br />Storage Tanks (B) — Tank (one form per tank). Will follow shortly <br />Greatly appreciate if there is any way that the updated plans can be reviewed/approved by your office while the <br />remaining pending items are addressed. Please advise. Feel free to contact our office should you have any questions. <br />Thank you, greatly appreciate your assistance on this project & please stay safe. <br />Sincerely, <br />Robert Velasco <br />A & S Engineering <br />28405 Sand Canyon Road, Suite "B" <br />Canyon Country, CA 91387 <br />Office #661-250-9300 <br />Fax #661-250-9333 <br />Cell #818-746-6986 <br />
The URL can be used to link to this page
Your browser does not support the video tag.