Laserfiche WebLink
Mr. Michael Jewell <br />To: <br />14 <br />description of this biological opinion, and a determination that the effects are within the <br />parameters of allowable take; (f) detailed survey protocols for implementing those <br />measures shown in Appendix A of this biological opinion; and (g) a request to the <br />Service for written concurrence with items 1(c) , l (e), and 1(f). If the Service concurs, we <br />shall issue a letter of concurrence and the Corps may proceed with construction and <br />OMRRR under this biological opinion. if we do not concur, we will specify our reasons <br />and -the -Corps -must re=initiate formal -consultation. — <br />In order to accurately estimate take, the Corps shall resurvey areas with pending <br />construction for elderberry shrubs no sooner than one year prior to the onset of that <br />construction. <br />1. For each discrete phase or construction contract, after designs are completed but before <br />commencement of construction, the Corps or Applicant, as appropriate, will submit to <br />the Service: (a) a pre -construction accounting of the actual amount of listed species <br />habitat which will be temporarily and permanently affected by that phase of the project, <br />specifically (i) areas of upland and aquatic habitat for the snake, (ii) numbers of <br />elderberry shrubs and stems in the diameter classes considered habitat for the beetle in <br />accordance with the Conservation Guidelines, and (iii) areas of Shallow Water Habitat as <br />habitat for the smelt affected by the project including the footprint of proposed gate <br />structures, the operational periods of such gates, and the area(s) isolated by such gates; <br />(b) a cumulative accounting of the effects on listed species habitat of all phases <br />constructed to date; (c) a narrative describing how the already constructed plus additional <br />proposed work effects fall within the take limits described in this biological opinion; (d) <br />documentation of the acquisition of credits or completed separate construction of any <br />required compensation habitat needed to offset the effects of any proposed project <br />construction; (e) its approved ETL variance for that phase, with a narrative explaining <br />how it is consistent with the project description of this biological opinion, and a <br />determination that the effects are within the parameters of allowable take; (f) detailed <br />survey protocols for implementing those measures shown in Appendix A of this <br />biological opinion; and (g) a request to the Service for written concurrence with items <br />1(c) ,1(e), and 1(f). If the Service concurs, we shall issue a letter of concurrence and the <br />Corps may proceed with construction and OMRRR under this biological opinion. If we <br />do riot concur, we will specify our reasons and the Corps must re-initiate formal <br />consultation. <br />In order to accurately estimate take, the Corps or Applicant, as appropriate, shall <br />resurvey areas with pending construction for elderberry shrubs no sooner than one year <br />prior to the onset of that construction. <br />13. CHANGE the following in Terms and Conditions, on p. 34, as follows: <br />From: <br />3. The Corps will prepare and submit to the Service for approval, a fisheries protection plan <br />to monitor and protect delta smelt that may be affected by in -water work outside of the <br />