My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieve Reports
>
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:54:23 PM
Creation date
12/16/2021 11:31:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
[REV] MAY & JULY 2014 RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-5 <br />1 Operations manager <br />2 Equipment operators (duties also include general labor) <br />2 Laborers <br />1 Water truck driver <br />Tempora ry laborers . as needed <br />• Equ ipment OperatorsGenera l Labo rers 3 positions <br />• Administrative and Office Personnel 2 position <br />The assignments and responsibilities of these personnel are described below: <br />Operations Ma na ger. The Operations Manager has overall responsibility for the site's <br />operation and management. <br />Equipment Operators and General Laborers. The equipment operators operate a variety of <br />equipment including a grinder. trammel. turner. water truck . and loaders"., forld ift, water <br />truol<s, wood chipper, and conveyors. The equipment operators spread the incoming waste <br />loads out on the tipping floor, create the compost windrows and curing piles. perform load <br />checks, keep records of the quantity of material recovered, and perform general <br />maintenance around the site and with equipment. The general laborers manually sort the <br />incoming waste loads to inspect for prohibited wastes , segregate and handle (Le., bale) the <br />sorted materials, operate the wood grinder, and perform assigned maintenance duties (i.e., <br />litter/debris collection) around the RRF building and storage areas, and Compost Facility. <br />Administrati\'e and Office Personnel. The administrative and office personnel chec l( the <br />hauler's waste manifests, Iwep records of incom i ng haulers, and the volume of material <br />recovered , perform communications tasl(s, and ma inta i n the office. <br />Training. Staff training methods are described in detail in Section 3.2.2 of this RCSI. <br />3.3 Facility Equipment <br />3.3.1 Type, Capacity, and Number of Units <br />Describe ,facility equipment, incl-&ding type, capacitj ~ and number of units in accordance w#h <br />14 CC/?, Sect/on 1B227(g). Erjl:Jipmenl m/:JSt be adequate fA type, capacit]~ and numbers to <br />aI/ow facility opemt/ons to meet all of the requhvments of the standafds. <br />Describe equipment to be used for handf.i.ng and processing waste, fAcludlng fAstfl:JFFlents <br />sUGh as temperature and moist&re probes. <br />On-site equipment will be used for handling and processing waste. The equipment available <br />at the RRF/Compost Facility is listed on Table 9. Additional equipment, sueh as Windro 'l.' <br />turn i ng equipment and including temperature and moisture probes, is availablewasyt'ill be <br />obta ined , as necessary, to meet all of the requirements of the compost operation standards. <br />Facility equipment iswi ll be maintained in reliable, working condition according to standard <br />maintenance practice and the manufacturer's recommendations. <br />Forward Composting Facility SWT Engineering <br />Report of Composting Site Information -May 2014 <br />z:\projects\allied waste\forward\resource re covery facility \5 yr perm it rvw 2013·14\rcs12014\text\sec 3 -revtr.doc
The URL can be used to link to this page
Your browser does not support the video tag.