My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:36:58 AM
Creation date
12/16/2021 11:39:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2014-0006 -37- <br />FORWARD INC. AND REPUBLIC SERVICES INC. <br />FORWARD CLASS II LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br /> <br /> <br />Task Compliance Date <br />A. Construction Plans <br />Submit construction and design plans for review and <br />approval. (see all Construction Specifications in <br />Section D, above and Section F of the SPRRs.) <br /> <br />90 days prior to <br />proposed construction <br />B. Construction Report <br />Submit a construction report for review and approval <br />upon completion demonstrating construction was in <br />accordance with approved construction plans (see <br />Standard Construction Specification F.27 in the <br />SPRRs). <br /> <br />60 days prior to <br />proposed discharge <br />C. Final Closure Plans <br />Submit a final or partial final closure and post-closure <br />maintenance plan, design plans, and CQA plan for <br />review and approval (see all Closure and Post- <br />Closure Specifications in Section E, above and <br />Section G of the SPRRs). <br /> <br />Two years prior to <br />closure <br />D. Unsaturated Zone Monitoring System <br />Submit a report that reviews the status of the <br />unsaturated zone monitoring system. The report <br />should document those monitoring points that need <br />repair or replacement, consider the need for <br />additional monitoring points and should establish a <br />time schedule to completely restore the monitoring <br />system. <br /> <br />1 June 2014 <br /> <br />E. Closure and Postclosure Maintenance Plan <br />Submit a revised Closure and Postclosure <br />Maintenance Plan with closure stages dates. The <br />revised Plan must include revised cost estimates for <br />Closure Financial Assurances. <br /> <br />1 June 2014 <br /> <br />F. Update Corrective Financial Assurance Cost <br />Estimate <br />
The URL can be used to link to this page
Your browser does not support the video tag.