My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:36:58 AM
Creation date
12/16/2021 11:39:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2014-0006 <br />FORWARD INC. AND REPUBLIC SERVICES INC. <br />FORWARD CLASS II LANDFILL <br />SAN JOAQUIN COUNTY <br />7 <br /> <br />Landfill gas monitoring points shall be field tested for the presence of methane <br />quarterly. Gas samples shall be collected from any monitoring point containing <br />5 or more percent methane and analyzed for the parameters specified in Table <br />VI. The Discharger shall collect, preserve and transport samples in accordance <br />with the quality assurance/quality control standards contained in the approved <br />Sample Collection and Analysis Plan. <br /> <br />In the event of a shutdown of the landfill gas extraction system, the Discharger <br />shall notify Board staff via e-mail, fax, or telephone within 24 hours of <br />knowledge and shall provide weekly status updates. This requirement excludes <br />shutdown events where the landfill gas system restarts itself or when the <br />system is restarted manually within 24 hours. All shutdowns, regardless of the <br />type of restart, shall be summarized in the quarterly reports. <br /> <br />Landfill gas monitoring reports shall be included with the quarterly reports and <br />shall include an evaluation of potential impacts of landfill gas on the <br />unsaturated zone beneath and adjacent to the landfill and compliance with the <br />Water Quality Protection Standard. <br /> <br />Monitoring shall be conducted at all active gas monitoring probes and extraction <br />wells. Additional landfill gas probes and wells installed subsequent to adoption <br />of this MRP shall be added to the monitoring program specified herein. <br /> <br />6. Facility Monitoring <br /> <br />a. Annual Facility Inspection <br /> <br />Annually, prior to the anticipated rainy season, but no later than <br />30 September, the Discharger shall conduct an inspection of the facility. <br />The inspection shall assess repair and maintenance needed for drainage <br />control systems, cover systems, surface impoundments and <br />groundwater monitoring wells; and shall assess preparedness for winter <br />conditions (including but not limited to erosion and sedimentation <br />control). The Discharger shall take photos of any problems areas before <br />and after repairs. Any necessary construction, maintenance, or repairs <br />shall be completed by 31 October. Annual facility inspection reporting <br />shall be submitted as required in Section B.4 of this MRP. <br /> <br />b. Major Storm Events <br /> <br />The Discharger shall inspect all precipitation, diversion, and drainage <br />facilities and all landfill side slopes for damage within 7 days following <br />major storm events capable of causing damage or significant erosion. <br />The Discharger shall take photos of any problems areas before and after <br />repairs. Necessary repairs shall be completed within 30 days of the
The URL can be used to link to this page
Your browser does not support the video tag.